Updated November 2026· Independently researched·8 min read
A quantity surveyor's tax depreciation schedule costs $550–$900 for a full-inspection residential report in Central Coast in 2026, $350–$500 desktop, and $1,200–$4,000+ for commercial property; insurance valuations run $500–$1,200 and construction cost plans $1,500–$6,000+.
Choosing a quantity surveyor on the Central Coast starts with a check: Membership of the Australian Institute of Quantity Surveyors is the usual sign of training; investors use depreciation reports against ATO rules.
Quick answerA quantity surveyor's tax depreciation schedule costs $550–$900 for a full-inspection residential report in Central Coast in 2026, $350–$500 desktop, and $1,200–$4,000+ for commercial property; insurance valuations run $500–$1,200 and construction cost plans $1,500–$6,000+. Get free Central Coast quotes →
Detailed Pricing — Quantity Surveyor Cost in Central Coast 2026
+2.0%Quantity Surveyor fees in Central Coast are up around 2.0% over the past year, re-verified against 90+ sources in November 2026.Year on year
Tier
Typical fee
What it funds
Desktop / self-assessed depreciation schedule
$350–$500
No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule
$550–$900
QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule
$1,200–$4,000+
Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report
$500–$1,200
Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report
$1,500–$6,000+
Construction estimating for developers, strata committees and council submissions.
Progress claim / bank drawdown assessment
$500–$1,800
Per claim. The surveyor checks the builder's progress claim against the work done.
Hourly quantity surveying advice
$100–$350 per hour
Ad hoc advice, cost reviews or help with a dispute, billed by the hour.
Central Coast notes for a quantity surveyor
Ask any Central Coast quantity surveyor to put the fee and what it leaves out in writing first.
File the Central Coast quantity surveyor's quote with later variations, so a dispute can be settled on the documents.
Some Central Coast clients use a Sydney-based quantity surveyor; check travel, meetings and who handles your work.
Treat our Central Coast band as typical quantity surveyor fees; the scope you agree is what fixes your price.
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Central Coast? Get a quote from a local quantity surveyor — free, no obligation.
What Moves the Quantity Surveyor Cost in Central Coast
On the Central Coast the quantity surveyor fee mostly follows whether the job is a depreciation schedule or a construction cost report, then the age of the building; read our table with both in mind.
Gosford (Narara) averages 1,328.7 mm of rain a year, wettest from February to April, with 154.7 mm in an average February (BOM, Gosford (Narara)), so site visits in the wet months can need rescheduling.
78.2% of Central Coast dwellings are separate houses, well above the NSW figure of 65.6% (ABS 2021 Census); that mix shapes what a quantity surveyor is asked to do here.
27.6% of Central Coast households rent, below the NSW figure of 32.6%, and 34.5% own outright (ABS 2021 Census), which brings investors into the quantity surveyor market.
Line up quotes from Gosford, Erina or Wyong firms against one written scope, and the quantity surveyor fees become comparable.
A Central Coast quantity surveyor who quotes well above the band should say why; how many years of depreciation the report covers is often the reason.
How to Keep the Quantity Surveyor Cost Sane in Central Coast
1
If your Central Coast rental is a house bought with no build records, budget for a full-inspection schedule rather than a desktop one.
2
Order the schedule soon after settlement so your accountant has it for the first year you rent the property out.
3
The ATO lets you claim an asset costing $300 or less in full in the year you start using it for the rental, unless it is part of a set that together costs more than $300.
4
The fee you pay a quantity surveyor for a construction cost estimate is deductible, according to the ATO; hold on to the invoice, and your accountant can tell you where it goes on the return.
5
Ask whether travel within the Central Coast area is included, and whether a second visit is charged if the tenant is not home on the day.
6
A schedule gets used year after year: the ATO's general rule allows capital works claims for 40 years after construction was completed.
Quantity Surveyor Cost on the Central Coast After Adding a Granny Flat
Adding a granny flat to a rental property creates a new set of assets beside an older house. The flat, with its contract and invoices, is straightforward; the existing home often is not, so expect a Central Coast quote on the inspected row, $550–$900.
Ask whether one schedule can cover both dwellings and whether the fee changes if you already hold a schedule for the main house. If only the new flat needs documenting, the desktop row is $350–$500.
Quantity Surveyor Cost in Central Coast by Report Type
Quick answerOn the Central Coast two things set the fee: which product you order, a schedule or a construction cost report, and how old the building is. A schedule sits at $350–$500 or $550–$900; a cost plan at $1,500–$6,000+.
Central Coast housing leans to separate houses, and a house bought with no build records is the case for $550–$900, with the surveyor on site in Terrigal or Kincumber measuring what the paperwork cannot show. A newer home in Somersby or Kariong whose builder's costs are on file can be done from documents at $350–$500. A rebuild figure for the insurer is another product at $500–$1,200, priced on today's construction costs rather than the original ones. The move between the residential rows comes down to the records that came with the sale.
Inside the inspected row, travel and access move the Central Coast figure: travel to Toukley or Charmhaven may or may not be inside the fee, and a tenant who is out on the day can mean a second trip. Wet months from February to April can push a visit back. Within $1,200–$4,000+ the fee follows floor area and tenancies. Before signing, ask how many years the schedule runs, whether travel and a repeat visit are covered, and when the report is due.
Quantity Surveyor Cost in Central Coast: What the Quote Should Include
On the Central Coast, fees from Gosford, Erina and Wyong firms only line up once each quote is written against the same scope: which report, whether anyone visits, how many years the schedule covers and whether travel within the area is included. An itemised quote is that scope on paper.
The row quoted: $350–$500 from your documents, or $550–$900 where a house was bought without build records and needs a visit.
How many years of depreciation the schedule covers, since that explains a quote that sits outside the band.
Travel within the Central Coast area named as included, from Woy Woy to Toukley, or priced as an extra.
Whether a repeat visit is billed when the tenant is out on the day, and who books access.
The schedule's two parts shown as lines: the building's construction cost and the fittings, with renovations by earlier owners estimated separately.
A rebuild figure for the insurer at $500–$1,200 as its own line, and whether it is gathered on the same visit.
The date the report will be delivered, in writing, and the fee for updating it after later building work.
GST on its own line; ask your accountant how the fee is treated.
Frequently Asked Questions — Quantity Surveyor Cost in Central Coast
Does wet weather change what a site inspection costs on the Central Coast?
The $550–$900 fee on the Central Coast stays the same whatever the weather, but the booking may not: the heavy rain the region gets in late summer and autumn can push a Gosford or Wyong visit back. Ask the surveyor whether a washed-out visit is rebooked inside the fee, and how far ahead the inspection should be booked if your accountant needs the schedule by a particular date. A desktop schedule from complete build records sidesteps the weather entirely.
What does a quantity surveyor charge to inspect a Terrigal or Woy Woy rental on the Central Coast?
A Central Coast house in Terrigal or Woy Woy bought with no build records is a $550–$900 job: the surveyor drives out, measures the dwelling, dates the additions and lists the fittings that a landlord claims on. A fibro cottage with one extension sits low in the bracket; a large renovated home with a pool and studio sits high. The quote should say whether travel between Gosford and Toukley is inside the fee.
What does a development cost report cost on the Central Coast?
On the Central Coast a cost report lodged with a development application, a cost plan for a new build at Somersby or Kariong, or a sinking fund forecast for a unit block at The Entrance is priced from the $1,500–$6,000+ bracket. The surveyor prices the drawings trade by trade; ask for totals without and with GST. A granny flat sits at the foot of the bracket; a multi-unit project in Gosford sits near the top. Ask what the council wants included first.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
How is a commercial depreciation schedule priced on the Central Coast?
A Central Coast industrial unit at West Gosford or Somersby, a shop in Erina or an office in Gosford is quoted from the $1,200–$4,000+ bracket, where floor area sets the starting point and fit-out moves it. A tilt-panel unit with a mezzanine and office pod sits near the bottom; a fitted gym or restaurant with plumbing, ventilation and a cool room climbs. Ask that the landlord's base building and each tenant's fit-out be shown as separate lines in the report.
What does an insurance rebuild valuation cost for a Central Coast home?
The $500–$1,200 bracket on the Central Coast buys the number an insurer wants: what it would cost today to clear a Terrigal or Kincumber block and put the house back, professional fees and demolition included. The surveyor measures rather than guesses, which is the point of paying for it. Steep bushland sites with retaining walls and pools take more measuring and sit toward the upper end of the bracket; a slab home on a flat Charmhaven lot stays near the lower end.
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →