Independent Australian Cost Guides
Updated November 2026

Commercial Solar Cost Australia 2026

Commercial solar in Australia runs $22,000–$33,000 for a 30 kW system installed after STCs in 2026 - see the full breakdown and the city guides below.
-1.5% Commercial Solar costs in Australia are down around 1.5% over the past year, re-verified against 90+ sources in November 2026. Year on year

Commercial solar in Australia is priced by system size. A 10 kW system for a small shop or office costs $8,000–$12,000 installed after STCs, 20 kW $15,000–$26,000, 30 kW $22,000–$33,000, 50 kW $35,000–$55,000 and 100 kW $70,000–$110,000. Per watt that is $0.70–$1.20, with the largest arrays on long shed roofs at the low end.

The site, not the panels, is what moves a quote between two businesses buying the same kilowatts. Tilt frames on a concrete tower roof need a structural engineering report at $800–$2,000, crane or cherry picker hire at $1,000–$3,000 a day and a dock booking; a flat metal shed roof takes the same panels with a hoist. An older switchboard adds a switchboard upgrade at $1,500–$5,000 before the inverter can connect.

Systems over 30 kW can be asked to pay for network upgrade or connection works at $2,000–$10,000, and commercial panel cleaning once the array is running costs $5–$15 a panel. Prices include GST. The bands on this page are national; each city guide below carries the same bands with that city's own year-on-year movement and local site notes.

Typical 30 kW commercial solar cost by city — What’s The Damage’s November 2026 re-verification across 90+ sources. Commercial solar is priced on a national basis, so the band is the same in every city; the year-on-year column is each city’s own movement.
City30 kW installed, after STCsYear on year
Sydney$22,000-$33,000↓ -1.4%
Melbourne$22,000-$33,000↓ -1.6%
Brisbane$22,000-$33,000↓ -1.3%
Perth$22,000-$33,000↓ -2.0%
Adelaide$22,000-$33,000↓ -0.9%
Gold Coast$22,000-$33,000↓ -1.3%
Canberra$22,000-$33,000↓ -1.5%
Hobart$22,000-$33,000↓ -1.5%
Darwin$22,000-$33,000↓ -1.5%
Newcastle$22,000-$33,000↓ -1.4%
Geelong$22,000-$33,000↓ -1.6%
Sunshine Coast$22,000-$33,000↓ -1.3%
Wollongong$22,000-$33,000↓ -1.4%
Townsville$22,000-$33,000↓ -1.3%
Byron Bay$22,000-$33,000↓ -1.4%
Central Coast$22,000-$33,000↓ -1.4%
Cairns$22,000-$33,000↓ -1.3%

Commercial Solar Cost by City — Australia

Location pin
Sydney
From $22,000 for 30 kW
-1.4%
Location pin
Melbourne
From $22,000 for 30 kW
-1.6%
Location pin
Brisbane
From $22,000 for 30 kW
-1.3%
Location pin
Perth
From $22,000 for 30 kW
-2.0%
Location pin
Adelaide
From $22,000 for 30 kW
-0.9%
Location pin
Gold Coast
From $22,000 for 30 kW
-1.3%
Location pin
Canberra
From $22,000 for 30 kW
-1.5%
Location pin
Hobart
From $22,000 for 30 kW
-1.5%
Location pin
Darwin
From $22,000 for 30 kW
-1.5%
Location pin
Newcastle
From $22,000 for 30 kW
-1.4%
Location pin
Geelong
From $22,000 for 30 kW
-1.6%
Location pin
Sunshine Coast
From $22,000 for 30 kW
-1.3%
Location pin
Wollongong
From $22,000 for 30 kW
-1.4%
Location pin
Townsville
From $22,000 for 30 kW
-1.3%
Location pin
Byron Bay
From $22,000 for 30 kW
-1.4%
Location pin
Central Coast
From $22,000 for 30 kW
-1.4%
Location pin
Cairns
From $22,000 for 30 kW
-1.3%

Commercial Solar Prices in Australia 2026: Cost Table and Price List

ServiceLowTypicalHigh
10 kW commercial system (small shop / office)$8,000installed$10,000$12,000
20 kW commercial system$15,000installed$20,000$26,000
30 kW commercial system$22,000installed$27,000$33,000
50 kW commercial system$35,000installed$44,000$55,000
100 kW commercial system$70,000installed$88,000$110,000
Installed cost per watt, commercial (after STCs)$0.70per W$0.90$1.20
Structural engineering report$800report$1,200$2,000
Switchboard upgrade for a commercial system$1,500per job$3,000$5,000
Network upgrade / connection works (systems over 30 kW)$2,000per job$5,000$10,000
Crane or cherry picker hire$1,000per day$2,000$3,000
Commercial panel cleaning$5per panel$10$15

Scoping commercial solar work? Get a quote from a commercial contractor - free, no obligation.

Get free quotes →

Prices include GST. National figures, November 2026.

What does a 30 kW commercial solar system cost?$22,000–$33,000 installed after STCs, $27,000 typical. The next sizes: $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW.
What site works get added to a commercial solar quote?A structural engineering report at $800–$2,000, a switchboard upgrade at $1,500–$5,000 where the board is old, network upgrade or connection works at $2,000–$10,000 on systems over 30 kW, and crane or cherry picker hire at $1,000–$3,000 a day for tower and tilt-frame roofs.

Worked Commercial Solar Cost Scenarios — Australia

Three examples priced from the national rows above. Each line names the row it draws on; the quote you receive prices your own roof, switchboard and network connection.

Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local installer will be in touch about your job. No spam, no middleman.

Scoping commercial solar work? Get a quote from a commercial contractor - free, no obligation.

Get free quotes →

Commercial Solar Costs by Sector — Australia

Sector sets the size, and the roof sets the site works.

What a Compliant Commercial Solar Quote Includes — Cost in Australia

Before comparing quotes, check each one prices the same kilowatts and the same panel and inverter brands, states how the installer gets panels and people onto the roof, and shows site works, certificates and GST on their own lines.

Commercial solar cost in Australia: system size, site works and running costs compared

Commercial solar cost in Australia comes in three parts: the system, the site works and the upkeep. The system is priced by size - $8,000–$12,000 for 10 kW (typically $10,000), $15,000–$26,000 for 20 kW, $22,000–$33,000 for 30 kW, $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW, all installed after STCs - and the installed cost per watt of $0.70–$1.20 falls as the array grows.

Site works are where quotes for the same kilowatts diverge. A structural engineering report at $800–$2,000 is usual before tilt frames go onto a concrete roof; a switchboard upgrade at $1,500–$5,000 is driven by the age of the board; crane or cherry picker hire at $1,000–$3,000 a day covers towers and tilt-frame roofs; and network upgrade or connection works at $2,000–$10,000 can apply to any system over 30 kW. Upkeep is mostly commercial panel cleaning at $5–$15 a panel, booked more often near the coast and on farms.

The Clean Energy Regulator says eligibility for solar PV systems under the Small-scale Renewable Energy Scheme has been expanded from 100 kW to 1 MW for eligible systems installed from 1 October 2026, with a fixed 5-year deeming period for 100 kW to 1 MW systems, and that STC applications for those mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected. A good quote shows the STC line separately, names who lodges any network application for a system over 30 kW, and prices cleaning per visit.

Commercial solar cost by system size in Australia

Quick answerAcross Australia pricing steps by kilowatts: a small shop or office sits in the $8,000–$12,000 10 kW bracket, a workshop, office floor or packing shed at 20 kW to 30 kW pays $15,000–$26,000 to $22,000–$33,000, and a distribution shed or factory at 50 kW to 100 kW pays $35,000–$55,000 to $70,000–$110,000.

A system gets bigger in panels, and the price per watt falls as it does: $0.70–$1.20 across the range, with 100 kW shed arrays at the bottom of it. The fixed items do not scale the same way. A structural engineering report at $800–$2,000 costs about the same for 20 kW as for 50 kW, and a switchboard upgrade at $1,500–$5,000 is driven by the age of the board, not the array.

What moves a job of a given size is getting panels and people onto the roof: towers need crane or cherry picker hire at $1,000–$3,000 a day, induction and dock slots; coastal and cyclone-region sites need rated fixings. Systems over 30 kW add network upgrade or connection works at $2,000–$10,000, and every size carries commercial panel cleaning at $5–$15 a panel once it is running.

Commercial solar cost in Australia: what the jobs are priced at

Commercial solar anywhere in the country starts with the same short list of jobs; what shifts the number is the roof, the switchboard and how far the installer travels. Tropical sites need cyclone-rated frames and a dry-season booking, coastal sites need marine-grade fixings, and inland and southern sites mostly need a clear roof and a modern board.

Frequently Asked Questions — Commercial Solar Cost in Australia

How much does commercial solar cost in Australia?
In Australia in 2026: $8,000–$12,000 for a 10 kW commercial system, $22,000–$33,000 for 30 kW and $70,000–$110,000 for 100 kW, installed after STCs, with $0.70–$1.20 per watt across the range. GST included.
How much does a 30 kW commercial solar system cost?
$22,000–$33,000 installed after STCs, with $27,000 typical. A tilt-frame install on a concrete roof adds a structural engineering report at $800–$2,000 and crane or cherry picker hire at $1,000–$3,000 a day; a metal shed roof usually needs neither.
What does a 100 kW commercial solar system cost?
$70,000–$110,000 installed after STCs, with $88,000 typical. Distribution sheds and factories are the usual buyers, and network upgrade or connection works at $2,000–$10,000 are priced on top because the system is over 30 kW.
What is the installed cost per watt for commercial solar?
$0.70–$1.20 per watt installed after STCs, with $0.90 typical. The larger the array the lower the figure: a 100 kW system at $70,000–$110,000 sits near the floor, a 10 kW system at $8,000–$12,000 near the top.
Does a business need a switchboard or network upgrade for solar?
Often one or both. A switchboard upgrade for a commercial system costs $1,500–$5,000 and depends on the age of the board. Network upgrade or connection works at $2,000–$10,000 apply to systems over 30 kW, so ask the installer to show the line and name who lodges the network application.
What changed for commercial solar systems over 100 kW?
The Clean Energy Regulator says the Renewable Energy (Electricity) Regulations 2001 have been amended to expand eligibility for solar PV systems under the Small-scale Renewable Energy Scheme from 100 kW to 1 MW, applying to eligible mid-scale systems installed from 1 October 2026, with a fixed 5-year deeming period; STC applications for mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected.
Does a commercial solar install need a structural engineering report?
A structural engineering report costs $800–$2,000, typically $1,200. Owners and bodies corporate usually ask for one before tilt frames go onto a concrete roof; it is less common on a single-storey metal shed.
What does commercial solar panel cleaning cost?
Commercial panel cleaning costs $5–$15 a panel, with $10 a panel typical. Coastal sites and farms book it more often; the quote should price it per visit.
Do commercial solar installers need accreditation?
For mid-scale systems of 100 kW to 1 MW, the Clean Energy Regulator says the system must have its panels, batteries or inverters listed on the Clean Energy Council list of approved components and meet Solar Accreditation Australia install guidelines. Ask for the installer's accreditation number on your quote and check the panel and inverter models are the ones listed.