How much does commercial solar cost in Hobart?

Commercial solar in Hobart runs $22,000–$33,000
for a 30 kW system installed, after STCs, GST included - other sizes and site works below
A Hobart business pays $22,000–$33,000 for a 30 kW commercial solar system installed after STCs, with $27,000 typical. A Brighton transport depot sizing up to 100 kW looks at $70,000–$110,000; a Salamanca cafe at 10 kW looks at $8,000–$12,000.
-1.5% Commercial Solar costs in Hobart are down around 1.5% over the past year, re-verified against 90+ sources in November 2026. Year on year
Typical 30 kW commercial system in Hobart
$27,000
30 kW installed after STCs, Hobart 2026, GST included
30 kW commercial system
$22,000-$33,000
50 kW commercial system
$35,000-$55,000
100 kW commercial system
$70,000-$110,000
$22,000$27,000$33,000

Hobart commercial solar is priced by system size: $8,000–$12,000 for a 10 kW system on a small shop or office, $15,000–$26,000 for 20 kW, $22,000–$33,000 for 30 kW, $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW, installed after STCs. Per watt that is $0.70–$1.20, with the long sheds at Brighton and Cambridge at the low end.

The building then shapes the Hobart quote. Tilt frames on a Macquarie Street or Collins Street office roof need a structural engineering report at $800–$2,000, crane or cherry picker hire at $1,000–$3,000 a day and a street-closure or dock booking; a Colorbond roof on a Derwent Park or Kingston unit takes the same panels with a hoist. Sandstone warehouses at Salamanca and older shopfronts in North Hobart add a switchboard upgrade at $1,500–$5,000 when the board cannot take an inverter.

Systems over 30 kW may carry network upgrade or connection works at $2,000–$10,000, and commercial panel cleaning once the array is running costs $5–$15 a panel. All prices include GST.

Quick answerCommercial solar in Hobart runs $22,000–$33,000 for a 30 kW system in 2026, with roof type, switchboard condition and network connection works setting the total. All figures on this page include GST. Get free Hobart quotes →

Commercial Solar Prices in Hobart 2026: Cost Table and Price List

ServiceLowTypicalHigh
10 kW commercial system (small shop / office)$8,000installed$10,000$12,000
20 kW commercial system$15,000installed$20,000$26,000
30 kW commercial system$22,000installed$27,000$33,000
50 kW commercial system$35,000installed$44,000$55,000
100 kW commercial system$70,000installed$88,000$110,000
Installed cost per watt, commercial (after STCs)$0.70per W$0.90$1.20
Structural engineering report$800report$1,200$2,000
Switchboard upgrade for a commercial system$1,500per job$3,000$5,000
Network upgrade / connection works (systems over 30 kW)$2,000per job$5,000$10,000
Crane or cherry picker hire$1,000per day$2,000$3,000
Commercial panel cleaning$5per panel$10$15

Scoping commercial solar work in Hobart? Get a quote from a local commercial contractor - free, no obligation.

Get Hobart quotes →

Prices include GST. Greater Hobart, November 2026.

What does a 30 kW commercial solar system cost in Hobart?$22,000–$33,000 installed after STCs, $27,000 typical. The next sizes: $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW.
What site works get added to a Hobart commercial solar quote?A structural engineering report at $800–$2,000, a switchboard upgrade at $1,500–$5,000 where the board is old, network upgrade or connection works at $2,000–$10,000 on systems over 30 kW, and crane or cherry picker hire at $1,000–$3,000 a day for tower and tilt-frame roofs.

Worked Commercial Solar Cost Scenarios — Hobart

Three Hobart jobs priced from the rows above: a Brighton transport depot, a Hobart CBD office and a Huon Valley packing shed. Each line names its row; the quote you get prices your own roof, board and connection.

Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local installer will be in touch about your job. No spam, no middleman.

Scoping commercial solar work in Hobart? Get a quote from a local commercial contractor - free, no obligation.

Get Hobart quotes →

Prices include GST. Greater Hobart, November 2026.

Commercial Solar Costs by Sector in Hobart

Hobart commercial solar runs from the northern industrial strip at Derwent Park, Moonah and Glenorchy, through the Brighton transport hub and the Cambridge airport estate, to CBD offices on Macquarie and Collins streets, Salamanca and Battery Point hospitality, Sandy Bay and Kingston retail, and the orchards and vineyards of the Huon and Coal River valleys.

What a Compliant Commercial Solar Quote Includes — Cost in Hobart

Before comparing Hobart quotes, check each one prices the same kilowatts and the same panel and inverter brands, states how the installer gets panels and people onto the roof, and shows site works, certificates and GST on their own lines.

Commercial solar cost in Hobart: Brighton sheds, CBD offices and valley orchards

For a Hobart small business the starting point is $8,000–$12,000 for a 10 kW system installed after STCs (typically $10,000), then $15,000–$26,000 for 20 kW and $22,000–$33,000 for 30 kW. Transport and processing sites buy 50 kW at $35,000–$55,000 and 100 kW at $70,000–$110,000, and those arrays take the installed cost per watt to the floor of $0.70–$1.20.

The roof writes the rest of a Hobart quote. New sheds at Brighton and Cambridge have clean metal decks and modern three-phase boards, so the quote stays close to the system price. CBD offices put panels on tilt frames over concrete, which brings a structural engineering report at $800–$2,000, crane or cherry picker hire at $1,000–$3,000 a day and a dock or street booking. Salamanca's sandstone warehouses and the older shopfronts of North Hobart and Moonah are where a switchboard upgrade at $1,500–$5,000 is most often needed.

The Clean Energy Regulator says eligibility for solar PV systems under the Small-scale Renewable Energy Scheme has been expanded from 100 kW to 1 MW for eligible systems installed from 1 October 2026, with a fixed 5-year deeming period for 100 kW to 1 MW systems, and that STC applications for those mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected. On a Hobart quote look for the STC line on its own, the name of whoever lodges the network application on a system over 30 kW, where $2,000–$10,000 of connection works can apply, and commercial panel cleaning at $5–$15 a panel priced per visit.

Commercial solar cost by system size in Hobart

Quick answerHobart pricing steps by kilowatts: a Salamanca cafe or Sandy Bay shop sits in the $8,000–$12,000 10 kW bracket, a Moonah workshop or Coal River cellar door at 20 kW to 30 kW pays $15,000–$26,000 to $22,000–$33,000, and a Brighton or Cambridge shed at 50 kW to 100 kW pays $35,000–$55,000 to $70,000–$110,000.

A bigger Hobart array buys a lower per-watt price, $0.70–$1.20 across the range with the 100 kW Brighton sheds at the bottom. Fixed items do not move with size: a structural engineering report at $800–$2,000 is much the same at 20 kW or 50 kW, and a switchboard upgrade at $1,500–$5,000 depends on the board's age, not the array.

Access and weather are the other levers on a Hobart job of any size. CBD offices need crane or cherry picker hire at $1,000–$3,000 a day plus dock and lift slots; Derwent-side and Kingston Beach sites need fixings rated for salt air, and winter shortens the install window. Over 30 kW the network upgrade or connection works line at $2,000–$10,000 appears, and commercial panel cleaning at $5–$15 a panel is the running cost at every size.

Frequently Asked Questions — Commercial Solar Cost in Hobart

What is the price of commercial solar in Hobart?
From our Hobart table: $8,000–$12,000 for a 10 kW commercial system (typically $10,000); $22,000–$33,000 for a 30 kW system (typically $27,000); $70,000–$110,000 for a 100 kW system (typically $88,000), all installed after STCs.
How much does a 30 kW commercial solar system cost in Hobart?
A 30 kW commercial solar system in Hobart costs $22,000–$33,000 installed after STCs, with $27,000 typical. A Collins Street tenancy on an office roof adds a structural engineering report at $800–$2,000 and crane or cherry picker hire at $1,000–$3,000 a day; a Huon Valley packing shed on a metal roof usually needs neither.
What does a 100 kW commercial solar system cost in Hobart?
Going by our Hobart table, expect $70,000–$110,000 for a 100 kW commercial system installed after STCs; the typical price is $88,000. Brighton and Cambridge sheds are the usual Hobart buyers, and network upgrade or connection works at $2,000–$10,000 are priced on top because the system is over 30 kW.
What is the installed cost per watt for commercial solar in Hobart?
$0.70–$1.20 per watt installed after STCs on our Hobart table, with $0.90 typical. The larger the array the lower the figure: a 100 kW system at $70,000–$110,000 sits near the floor, a 10 kW system at $8,000–$12,000 near the top.
Does a Hobart business need a switchboard or network upgrade for solar?
Often one or both. A switchboard upgrade for a commercial system costs $1,500–$5,000 and is common in Salamanca's sandstone warehouses and the older shopfronts of North Hobart and Moonah. Network upgrade or connection works at $2,000–$10,000 apply to systems over 30 kW, so ask the installer to show the line and name who lodges the network application.
What changed for commercial solar systems over 100 kW?
The Clean Energy Regulator says the Renewable Energy (Electricity) Regulations 2001 have been amended to expand eligibility for solar PV systems under the Small-scale Renewable Energy Scheme from 100 kW to 1 MW, applying to eligible mid-scale systems installed from 1 October 2026, with a fixed 5-year deeming period; STC applications for mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected.
Does a commercial solar install in Hobart need a structural engineering report?
A structural engineering report costs $800–$2,000 on our Hobart table, typically $1,200. Owners of CBD office buildings usually ask for one before tilt frames go onto a concrete roof; a single-storey metal unit at Derwent Park rarely needs it.
What does commercial solar panel cleaning cost in Hobart?
Commercial panel cleaning in Hobart costs $5–$15 a panel, with $10 a panel typical. Derwent-side sites and Huon and Coal River valley growers after harvest book it more often; have the quote price it per visit.
Do Hobart commercial solar installers need accreditation?
For mid-scale systems of 100 kW to 1 MW, the Clean Energy Regulator says the system must have its panels, batteries or inverters listed on the Clean Energy Council list of approved components and meet Solar Accreditation Australia install guidelines. Ask for the accreditation number on your Hobart quote and check the panel and inverter models against the listed products.

Advertise with us

Reach Australian businesses researching commercial service costs. Fill in your details and we'll be in touch within 1 business day.

Thanks! We'll be in touch

Expect a reply within 1 business day.

Got a question about costs?
Chat with Sam
Sam the Platypus
Online now
Powered by What's The Damage