Independent Australian Cost Guides
Updated November 2026
← Commercial Solar across Australia

How much does commercial solar cost in Townsville?

Commercial solar in Townsville runs $22,000–$33,000
for a 30 kW system installed, after STCs, GST included - other sizes and site works below
Townsville businesses pay $22,000–$33,000 for a 30 kW commercial solar system installed after STCs, with $27,000 typical. A Bohle wholesaler going to 100 kW is looking at $70,000–$110,000; a Flinders Street bar at 10 kW is looking at $8,000–$12,000.
-1.3% Commercial Solar costs in Townsville are down around 1.3% over the past year, re-verified against 90+ sources in November 2026. Year on year
Typical 30 kW commercial system in Townsville
$27,000
30 kW installed after STCs, Townsville 2026, GST included
30 kW commercial system
$22,000-$33,000
50 kW commercial system
$35,000-$55,000
100 kW commercial system
$70,000-$110,000
$22,000$27,000$33,000

Townsville commercial solar is quoted by the kilowatt: $8,000–$12,000 for a 10 kW system on a small shop or office, $15,000–$26,000 for 20 kW, $22,000–$33,000 for 30 kW, $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW, installed after STCs. Per watt the installed price runs $0.70–$1.20, and the wide Bohle and Stuart sheds sit at the low end of it.

Cyclone-region mounting sets a Townsville quote apart from a southern one: every array goes on a rated frame, and a tilt-frame job on a CBD or Strand building needs a structural engineering report at $800–$2,000 before the frames are fixed, with crane or cherry picker hire at $1,000–$3,000 a day to land the panels. Older boards in Garbutt workshops and the original Flinders Street shops add a switchboard upgrade at $1,500–$5,000.

Over 30 kW, network upgrade or connection works at $2,000–$10,000 may be added, and commercial panel cleaning after the dry-season dust costs $5–$15 a panel. Prices include GST.

Quick answerCommercial solar in Townsville runs $22,000–$33,000 for a 30 kW system in 2026, with roof type, switchboard condition and network connection works setting the total. All figures on this page include GST. Get free Townsville quotes →

Commercial Solar Prices in Townsville 2026: Cost Table and Price List

ServiceLowTypicalHigh
10 kW commercial system (small shop / office)$8,000installed$10,000$12,000
20 kW commercial system$15,000installed$20,000$26,000
30 kW commercial system$22,000installed$27,000$33,000
50 kW commercial system$35,000installed$44,000$55,000
100 kW commercial system$70,000installed$88,000$110,000
Installed cost per watt, commercial (after STCs)$0.70per W$0.90$1.20
Structural engineering report$800report$1,200$2,000
Switchboard upgrade for a commercial system$1,500per job$3,000$5,000
Network upgrade / connection works (systems over 30 kW)$2,000per job$5,000$10,000
Crane or cherry picker hire$1,000per day$2,000$3,000
Commercial panel cleaning$5per panel$10$15

Scoping commercial solar work in Townsville? Get a quote from a local commercial contractor - free, no obligation.

Get Townsville quotes →

Prices include GST. Townsville and the Burdekin, November 2026.

What does a 30 kW commercial solar system cost in Townsville?$22,000–$33,000 installed after STCs, $27,000 typical. The next sizes: $35,000–$55,000 for 50 kW and $70,000–$110,000 for 100 kW.
What site works get added to a Townsville commercial solar quote?A structural engineering report at $800–$2,000, a switchboard upgrade at $1,500–$5,000 where the board is old, network upgrade or connection works at $2,000–$10,000 on systems over 30 kW, and crane or cherry picker hire at $1,000–$3,000 a day for tower and tilt-frame roofs.

Worked Commercial Solar Cost Scenarios — Townsville

Three Townsville examples priced from the rows above: a Bohle distribution shed, a CBD office building and a Burdekin packing shed. Each line names its row; the quote you receive prices your own roof, board and connection.

Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local installer will be in touch about your job. No spam, no middleman.

Scoping commercial solar work in Townsville? Get a quote from a local commercial contractor - free, no obligation.

Get Townsville quotes →

Prices include GST. Townsville and the Burdekin, November 2026.

Commercial Solar Costs by Sector in Townsville

Townsville commercial solar runs from the industrial estates at Bohle, Garbutt, Mount St John and Stuart, through the port precinct, to CBD offices on Flinders Street, Strand and Palmer Street hospitality, Castletown and Fairfield Waters retail, and the cane, mango and melon farms of the Burdekin and the Herbert.

What a Compliant Commercial Solar Quote Includes — Cost in Townsville

Before comparing Townsville quotes, check each one prices the same kilowatts and the same panel and inverter brands, states how the installer gets panels and people onto the roof, and shows site works, certificates and GST on their own lines.

Commercial solar cost in Townsville: Bohle sheds, Flinders Street roofs and Burdekin farms

A Townsville small business starts at $8,000–$12,000 for a 10 kW system installed after STCs (typically $10,000), then $15,000–$26,000 for 20 kW and $22,000–$33,000 for 30 kW. Freight and wholesale sites buy 50 kW at $35,000–$55,000 and 100 kW at $70,000–$110,000, and those arrays are what take the installed cost per watt to the floor of $0.70–$1.20.

The roof and the season then write the rest of a Townsville quote. New sheds at Bohle and Stuart have clean metal decks, rated purlins and modern boards, so the quote stays near the system price and the job is done in the dry. CBD and Strand buildings put panels on rated tilt frames over concrete, bringing a structural engineering report at $800–$2,000, crane or cherry picker hire at $1,000–$3,000 a day and a dock booking. The original Flinders Street shops and the workshops around Garbutt and Railway Estate are where a switchboard upgrade at $1,500–$5,000 most often appears.

The Clean Energy Regulator says eligibility for solar PV systems under the Small-scale Renewable Energy Scheme has been expanded from 100 kW to 1 MW for eligible systems installed from 1 October 2026, with a fixed 5-year deeming period for 100 kW to 1 MW systems, and that STC applications for those mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected. On a Townsville quote look for the STC line on its own, the name of whoever lodges the network application on a system over 30 kW, where $2,000–$10,000 of connection works can apply, and commercial panel cleaning at $5–$15 a panel priced per visit.

Commercial solar cost by system size in Townsville

Quick answerTownsville pricing steps by kilowatts: a Flinders Street bar or Castletown shop sits in the $8,000–$12,000 10 kW bracket, a Garbutt workshop or Burdekin packing shed at 20 kW to 30 kW pays $15,000–$26,000 to $22,000–$33,000, and a Bohle or Stuart shed at 50 kW to 100 kW pays $35,000–$55,000 to $70,000–$110,000.

A larger Townsville array lowers the per-watt figure, $0.70–$1.20 across the range with the 100 kW Bohle sheds at the bottom. Fixed items do not scale: a structural engineering report at $800–$2,000 costs much the same at 20 kW or 50 kW, and a switchboard upgrade at $1,500–$5,000 depends on the board's age rather than the array.

Access and the wet are the other levers on a Townsville job of any size. CBD buildings need crane or cherry picker hire at $1,000–$3,000 a day plus dock and lift slots; seafront sites on The Strand, at the Breakwater and on Magnetic Island need fixings rated for salt air and cyclone loads, and installers book the dry season first. Over 30 kW the network upgrade or connection works line at $2,000–$10,000 appears, and commercial panel cleaning at $5–$15 a panel is the running cost at every size.

Frequently Asked Questions — Commercial Solar Cost in Townsville

What is the price of commercial solar in Townsville?
From our Townsville table: $8,000–$12,000 for a 10 kW commercial system (typically $10,000); $22,000–$33,000 for a 30 kW system (typically $27,000); $70,000–$110,000 for a 100 kW system (typically $88,000), all installed after STCs.
How much does a 30 kW commercial solar system cost in Townsville?
A 30 kW commercial solar system in Townsville costs $22,000–$33,000 installed after STCs, with $27,000 typical. A Flinders Street tenancy on an office roof adds a structural engineering report at $800–$2,000 and crane or cherry picker hire at $1,000–$3,000 a day; a Burdekin packing shed on a rated metal roof usually needs neither.
What does a 100 kW commercial solar system cost in Townsville?
Going by our Townsville table, expect $70,000–$110,000 for a 100 kW commercial system installed after STCs; the typical price is $88,000. Bohle, Mount St John and Stuart sheds are the usual Townsville buyers, and network upgrade or connection works at $2,000–$10,000 are priced on top because the system is over 30 kW.
What is the installed cost per watt for commercial solar in Townsville?
$0.70–$1.20 per watt installed after STCs on our Townsville table, with $0.90 typical. The larger the array the lower the figure: a 100 kW system at $70,000–$110,000 sits near the floor, a 10 kW system at $8,000–$12,000 near the top.
Does a Townsville business need a switchboard or network upgrade for solar?
Often one or both. A switchboard upgrade for a commercial system costs $1,500–$5,000 and is common in the original Flinders Street shops and the older workshops around Garbutt and Railway Estate. Network upgrade or connection works at $2,000–$10,000 apply to systems over 30 kW, so ask the installer to show the line and name who lodges the network application.
What changed for commercial solar systems over 100 kW?
The Clean Energy Regulator says the Renewable Energy (Electricity) Regulations 2001 have been amended to expand eligibility for solar PV systems under the Small-scale Renewable Energy Scheme from 100 kW to 1 MW, applying to eligible mid-scale systems installed from 1 October 2026, with a fixed 5-year deeming period; STC applications for mid-scale systems will not open until mid to late November 2026. Existing arrangements for systems smaller than 100 kW are not affected.
Does a commercial solar install in Townsville need a structural engineering report?
A structural engineering report costs $800–$2,000 on our Townsville table, typically $1,200. Owners of CBD and Strand buildings usually ask for one before rated tilt frames go onto a concrete roof; a single-storey metal unit at Bohle with rated purlins rarely needs it.
What does commercial solar panel cleaning cost in Townsville?
Commercial panel cleaning in Townsville costs $5–$15 a panel, with $10 a panel typical. Seafront sites on The Strand and Magnetic Island, and Burdekin growers after the crush, book it more often; have the quote price it per visit.
Do Townsville commercial solar installers need accreditation?
For mid-scale systems of 100 kW to 1 MW, the Clean Energy Regulator says the system must have its panels, batteries or inverters listed on the Clean Energy Council list of approved components and meet Solar Accreditation Australia install guidelines. Ask for the accreditation number on your Townsville quote and check the panel and inverter models against the listed products.

Advertise with us

Reach Australian businesses researching commercial service costs. Fill in your details and we'll be in touch within 1 business day.

Thanks! We'll be in touch

Expect a reply within 1 business day.

Got a question about costs?
Chat with Sam
Sam the Platypus
Online now
Powered by What's The Damage