Quantity Surveyor Cost in Townsville (2026)
There are three common reasons Townsville property owners hire a quantity surveyor: a tax depreciation schedule on a rental, a rebuild cost for insurance, or construction estimating before a project starts. Our table prices a schedule worked up from plans and photos at $300–$450 and one with a site visit at $500–$800. An insurance replacement-cost report is $450–$1,100. Construction cost plans, body corporate sinking fund forecasts and reports for a development application run $1,350–$5,500+, and commercial or mixed-use schedules $1,100–$3,500+, because the fee grows with the size of the building and the detail the report needs.
Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?
Detailed Pricing — Quantity Surveyor Cost in Townsville 2026
| Tier | Typical fee | What it funds |
|---|---|---|
| Desktop / self-assessed depreciation schedule | $300–$450 | No site visit. Suits newer builds with documented costs. |
| Full-inspection residential schedule | $500–$800 | QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible. |
| Commercial / mixed-use schedule | $1,100–$3,500+ | Offices, retail, industrial. Priced on floor area and fit-out complexity. |
| Insurance replacement-cost report | $450–$1,100 | Rebuild valuation for strata or owner insurance. |
| Cost plan / sinking fund / DA cost report | $1,350–$5,500+ | Construction estimating for developers, strata committees and council submissions. |
| Progress claim / bank drawdown assessment | $450–$1,600 | Per claim. The surveyor checks the builder's progress claim against the work done. |
| Hourly quantity surveying advice | $100–$300 per hour | Ad hoc advice, cost reviews or help with a dispute, billed by the hour. |
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Townsville? Get a quote from a local quantity surveyor — free, no obligation.
Get Townsville quotes →What Moves the Quantity Surveyor Cost in Townsville
- A city of renters. A larger share of Townsville households rent than across Queensland: 38.3%, against 33.1% statewide and 30.6% nationally, while only 23.5% own outright (ABS 2021 Census). The median rent was $310 a week. For each of those rentals, a depreciation schedule turns the building and its fittings into a list of yearly deductions your accountant can work from.
- Large family houses. Separate houses are 80.1% of Townsville dwellings and 39.4% have four bedrooms or more (ABS 2021 Census). A large house with a long list of fittings is where a site visit at $500–$800 tends to earn its fee, as the surveyor counts and photographs items plans don't show. A desktop job at $300–$450 can suit a newer home with good build records.
- Before cyclone season. Australia's cyclone season runs from November to April (BOM), and in Townsville February is the wettest month, averaging 312.4 mm (BOM averages). A replacement-cost report for insurance, at $450–$1,100, works out today's cost to rebuild, giving you a figure to test your sum insured against before the season. It answers a different question from a tax schedule, so ask whether one visit can produce both.
- Owner-built or extended. If you built the home or added to it, the ATO will take precise documents, receipts for example, as proof of the construction cost, and capital works deductions can start only once construction is complete. Where the records are gone, the ATO will rely on an estimated build cost from a quantity surveyor or a similarly qualified independent person; what you pay for that estimate is deductible.
- Second-hand plant. Plant in a home you buy, such as air conditioners and stoves, is claimed separately from the building. The ATO limits claims on second-hand assets in residential rentals, but assets can still count in a home bought new, or within 6 months of being newly built or substantially renovated, when no one had claimed them before. Ask the surveyor to check this before you pay for a full schedule.
- Construction estimating. Before you build or renovate, a cost plan prices the work from the drawings so you can test your budget against builder quotes. Sinking fund forecasts for a body corporate sit in the same $1,350–$5,500+ band. Townsville is in NCC climate zone 1, so the design choices that suit a hot, humid climate, such as shading and ventilation, belong in the plan from the start.
How to Keep the Quantity Surveyor Cost Sane in Townsville
Quantity Surveyor Cost in Townsville for an Off-the-Plan Purchase
An off-the-plan purchase is the case the desktop schedule was made for. The build is new and the developer's costs are on record, so a Townsville investor can order the schedule at $300–$450 with no site visit.
Time the order for settlement, once the final plans and inclusions are confirmed. If the finished unit differs from the brochure, or you add furniture, ask whether the surveyor would move you to the inspected row at $500–$800.
Tax Depreciation Schedule Cost in Townsville: Quantity Surveyor Prices
A tax depreciation schedule in Townsville costs $300–$450 as a desktop schedule prepared without a visit, and $500–$800 with a full site inspection. A commercial or mixed-use property costs $1,100–$3,500+.
A site inspection earns its place on an older Townsville house or one renovated since it was built, where items have to be measured and dated in person. A new build with full plans and contracts suits the desktop row.
Construction estimating for builders and developers, such as a cost plan or a development application cost report, is priced at $1,350–$5,500+. Ask how quickly the schedule is delivered and what the surveyor needs from the owner.
Quantity Surveyor Cost in Townsville by Report Type
Townsville is a city of renters in separate houses, plenty with four or more bedrooms. If a newer Kirwan or Douglas home has its build records, it can be scheduled from the paperwork at $300–$450. If a big North Ward or Castle Hill house is full of fittings, the surveyor walks through, counts and photographs, which is $500–$800. A body corporate planning for repairs is buying a sinking fund forecast at $1,350–$5,500+. The length of the fittings list and the state of the records are what separate a desktop job from an inspected one here.
Within a row, timing and travel move the Townsville figure. February is the wettest month and the cyclone season runs from November to April, so a rebuild figure at $450–$1,100 ordered ahead of it leaves time to test the sum insured, and a site visit in the wet may need rebooking. Travel to an outer suburb may sit outside the fee. For a build, a cost plan priced from the drawings tests your budget against builder quotes. Before signing, ask whether travel and a second trip are covered, and whether second-hand plant has been checked.
Quantity Surveyor Cost in Townsville: What the Quote Should Include
In Townsville the quote should say whether the surveyor is visiting, whether travel to your suburb is covered, and when a rebuild figure for insurance will be ready, so the sum insured can be checked before the November to April cyclone season rather than during it.
- The row: $300–$450 for a newer home with good build records, or $500–$800 for a large house where fittings the plans do not show have to be counted.
- Travel to Kirwan, Douglas or Aitkenvale named as inside the fee or billed on top.
- For a rebuild figure at $450–$1,100, a delivery date ahead of cyclone season, so the sum insured can be adjusted in time.
- Second-hand plant that came with the home, air conditioners and stoves, flagged for the surveyor to check before the schedule is priced.
- For an owner-built or extended home, each piece of work with its completion date, costed as a separate item.
- For a build or renovation, a cost plan priced from the drawings at $1,350–$5,500+, with shading and ventilation for a hot, humid climate in the plan from the start.
- The delivery date in writing, and whether one visit can produce both the schedule and the insurance figure.
- The fee for updating the schedule after later work, and GST on its own line; ask your accountant how the fee is treated.
Frequently Asked Questions — Quantity Surveyor Cost in Townsville
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →