Quantity Surveyor Cost in Hobart (2026)

A quantity surveyor's tax depreciation schedule costs $500–$800 for a full-inspection residential report in Hobart in 2026, $300–$450 desktop, and $1,100–$3,500+ for commercial property; insurance valuations run $450–$1,100 and construction cost plans $1,350–$5,500+.

If you are looking for a plant and equipment valuer in Hobart for a rental, the report you are after is usually a quantity surveyor's depreciation schedule, which lists the fittings you can depreciate alongside the building itself. Prepared from plans, photos and records, a schedule costs $300–$450; with the surveyor on site it is $500–$800. A rebuild figure for insurance is $450–$1,100. Commercial and mixed-use schedules run $1,100–$3,500+, and forecasts for a strata sinking fund, cost plans and development cost reports sit at $1,350–$5,500+. Which report you order, and how much time on site it takes, sets the fee.

Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?

Quick answerA quantity surveyor's tax depreciation schedule costs $500–$800 for a full-inspection residential report in Hobart in 2026, $300–$450 desktop, and $1,100–$3,500+ for commercial property; insurance valuations run $450–$1,100 and construction cost plans $1,350–$5,500+. Get free Hobart quotes →
Hobart quantity surveyor fees guide 2026

Detailed Pricing — Quantity Surveyor Cost in Hobart 2026

+1.5%Quantity Surveyor fees in Hobart are up around 1.5% over the past year, re-verified against 90+ sources in November 2026.Year on year
TierTypical feeWhat it funds
Desktop / self-assessed depreciation schedule$300–$450No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule$500–$800QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule$1,100–$3,500+Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report$450–$1,100Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report$1,350–$5,500+Construction estimating for developers, strata committees and council submissions.
Progress claim / bank drawdown assessment$450–$1,600Per claim. The surveyor checks the builder's progress claim against the work done.
Hourly quantity surveying advice$100–$300 per hourAd hoc advice, cost reviews or help with a dispute, billed by the hour.
Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.

Getting quotes for Quantity Surveyor work in Hobart? Get a quote from a local quantity surveyor — free, no obligation.

Get Hobart quotes →
Prices verified November 2026 · Cross-referenced against 90+ Australian pricing sources · See methodology

Get a fair Quantity Surveyor quote in Hobart

Local professionals · Free quotes. No obligation, no spam.

Get Quotes in Hobart →
Factors affecting Quantity Surveyor cost in Hobart

What Moves the Quantity Surveyor Cost in Hobart

How to Keep the Quantity Surveyor Cost Sane in Hobart

1
If you built recently and still have the builder's contract and invoices, check if the surveyor can work from those records in a desktop schedule; the ATO treats precise records such as receipts as evidence of what it cost to build.
2
Need an insurance figure as well? Ask for both reports from a single site visit.
3
Check who is preparing your estimate: the ATO says valuers, real estate agents, accountants and solicitors generally lack the qualifications for it unless they are otherwise qualified.
4
Keep a running list of plant you add later, such as a new air conditioner or oven; the ATO recommends at least a spreadsheet for depreciating assets.
5
Small items are treated differently: the ATO allows assets costing $300 or less to be deducted in full unless they are part of a set that together costs more, and assets under $1,000 can be grouped in a low-value pool, so ask your accountant how that applies to you.
6
Hold on to the finished report, because as a general rule capital works can be claimed for 40 years after construction was completed and your accountant will return to it every year.

Quantity Surveyor Cost in Hobart to Check a Home's Insured Rebuild Value

Owners who doubt the sum insured on their house can have it tested. A quantity surveyor's insurance replacement-cost report puts a figure on rebuilding the home as it stands, and in Hobart it costs $450–$1,100.

It suits houses that are hard to price from an online calculator: steep sites, heritage features, or large extensions. Ask whether the figure includes demolition and site clearing, and send the surveyor your policy schedule so the report uses the same headings as your insurer.

Quantity Surveyor Cost in Hobart by Report Type

Quick answerIn Hobart the fee follows the records and the report: $300–$450 when the builder's paperwork covers the house, $500–$800 when the surveyor counts the plant and measures on site, and $1,350–$5,500+ for a strata sinking fund forecast.

Hobart is a city of houses, and the row a house falls in depends on what came with it. If a recent Kingston home has its contract and invoices filed, it can be scheduled from them at $300–$450. If an older house in New Town or Moonah has no construction records, it has to be measured on site at $500–$800, with every item of plant counted. A shop with a flat above is a different product at $1,100–$3,500+, priced on size, tenancies and fit-out. More rooms and more plant push a house from the first row toward the second.

Within a row, the Hobart fee moves with what has to be counted and how the building is used. A house with more rooms holds more plant to list, which lengthens the visit. For a commercial building, the surveyor wants the building's history and current use, because those shape the report. A rebuild figure at $450–$1,100 is priced on today's cost to rebuild, not the original outlay, so it sits beside a schedule rather than replacing it. Before signing, ask that the plant schedule be included, that later purchases can be added, and that the delivery date is written in.

Quantity Surveyor Cost in Hobart: What the Quote Should Include

In Hobart a quote for a depreciation schedule should show that the plant, meaning items like the dishwasher, air conditioners, stoves and curtains, is listed alongside the building, since one report can cover both. It should also say whether the surveyor is working from your builder's contract and invoices or coming to the house.

Frequently Asked Questions

What does a tax depreciation schedule cost in Hobart?
Our Hobart table puts a desktop (self-assessed) schedule at $300–$450, a full-inspection residential schedule at $500–$800 and a commercial or mixed-use schedule at $1,100–$3,500+.
What does a plant and equipment valuation cost in Hobart?
A Hobart landlord searching for a plant and equipment valuer is after the fittings list that sits inside a depreciation schedule: the dishwasher, heat pumps, stoves, carpets and curtains counted and valued separately from the building. That list is produced on site, so the fee falls in the $500–$800 bracket, and a Sandy Bay house full of fitted appliances takes longer to count than a bare rental in Moonah.
What does a strata sinking fund forecast cost in Hobart?
A Hobart body corporate wanting a long-term funding forecast for its building is buying from the $1,350–$5,500+ bracket. The surveyor inspects the common property of a Battery Point or Bellerive block, lists roofs, gutters, paintwork, paths and any lifts, and estimates when each will need money and how much. A small group of units sits at the low end of the bracket; a larger complex with lifts and a car park sits higher.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
How is a commercial asset valuation priced in Hobart?
A Hobart shop in New Town, a Glenorchy workshop or a mixed-use building with a cafe below and flats above is priced from the $1,100–$3,500+ bracket on floor area and fit-out. A warehouse with a concrete floor and little inside sits near the foot of the bracket; a fitted cafe with commercial kitchen, cool room and seating climbs. Ask whether the assets left by a previous tenant are listed apart from works you paid for, so the schedule shows both.
What does an insurance rebuild figure cost for a Battery Point cottage in Hobart?
In Hobart the $450–$1,100 bracket buys a measured estimate of what clearing the site and rebuilding the home would cost today, with demolition and professional fees allowed for. A sandstone cottage in Battery Point or a weatherboard in New Town needs a larger allowance for matching materials and skilled trades than a brick veneer in Glenorchy, which is what lifts the fee within the bracket. Ask for the report and the depreciation inspection to be done on one visit.

Our Methodology

These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →

Advertise with us

Reach Australians researching the cost of professional services. Fill in your details and we'll be in touch within 1 business day.

Thanks! We'll be in touch

Expect a reply within 1 business day.

Got a question about costs?
Chat with Sam
Sam the Platypus
Online now
Powered by What's The Damage