Quantity Surveyor Cost in Hobart (2026)
If you are looking for a plant and equipment valuer in Hobart for a rental, the report you are after is usually a quantity surveyor's depreciation schedule, which lists the fittings you can depreciate alongside the building itself. Prepared from plans, photos and records, a schedule costs $300–$450; with the surveyor on site it is $500–$800. A rebuild figure for insurance is $450–$1,100. Commercial and mixed-use schedules run $1,100–$3,500+, and forecasts for a strata sinking fund, cost plans and development cost reports sit at $1,350–$5,500+. Which report you order, and how much time on site it takes, sets the fee.
Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?
Detailed Pricing — Quantity Surveyor Cost in Hobart 2026
| Tier | Typical fee | What it funds |
|---|---|---|
| Desktop / self-assessed depreciation schedule | $300–$450 | No site visit. Suits newer builds with documented costs. |
| Full-inspection residential schedule | $500–$800 | QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible. |
| Commercial / mixed-use schedule | $1,100–$3,500+ | Offices, retail, industrial. Priced on floor area and fit-out complexity. |
| Insurance replacement-cost report | $450–$1,100 | Rebuild valuation for strata or owner insurance. |
| Cost plan / sinking fund / DA cost report | $1,350–$5,500+ | Construction estimating for developers, strata committees and council submissions. |
| Progress claim / bank drawdown assessment | $450–$1,600 | Per claim. The surveyor checks the builder's progress claim against the work done. |
| Hourly quantity surveying advice | $100–$300 per hour | Ad hoc advice, cost reviews or help with a dispute, billed by the hour. |
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Hobart? Get a quote from a local quantity surveyor — free, no obligation.
Get Hobart quotes →What Moves the Quantity Surveyor Cost in Hobart
- Plant and the building. The ATO describes depreciating assets as items that can be described as plant and are not part of the building's structure, such as a dishwasher, air conditioners, stoves and curtains. They are claimed separately from capital works on the structure, and a quantity surveyor's report can include a schedule of them, so one Hobart report can cover both the plant and the building.
- Three-bedroom houses. Greater Hobart is a city of houses: separate houses account for 85.1% of dwellings and 47.9% of homes have three bedrooms, against 72.3% and 39% nationally (ABS 2021 Census). A typical house fits the residential tiers, $300–$450 from records or $500–$800 with a visit; more rooms and more fittings to count mean more time to schedule.
- When you bought it. Whether you can claim the plant already in a home turns on when and how you bought it. The ATO says that past its cut-off, a residential property has to be brand new or substantially renovated for those assets to count, and assets in a new home can qualify if you acquired it within 6 months of completion. Have the surveyor or your accountant check this before you order.
- No build records. The ATO bases capital works deductions on what the building cost to construct rather than the price you paid, and it rejects the insured cost and replacement cost as substitutes. When an older Hobart house comes with no construction records, it will take a cost estimate from an independent professional with the right qualifications, such as a quantity surveyor, and you can claim a deduction for the fee.
- Renters across Hobart. In Greater Hobart 28.8% of households rent, above the Tasmanian figure of 26.4%, and the median weekly rent was $350 (ABS 2021 Census). Landlords behind those rentals may have capital works and plant to claim. Whether the deductions on your property outweigh the fee for a schedule is a question for your accountant.
- Insurance and strata work. An insurance report, $450–$1,100, puts a figure on rebuilding now, a separate question from the original build cost, and the ATO will not accept replacement cost as a construction figure. Flats and apartments make up 8.2% of Hobart dwellings (ABS 2021 Census); a strata scheme planning its sinking fund needs forecast work in the $1,350–$5,500+ band.
- Commercial and mixed-use. Shops, offices and buildings with a shop below and a flat above are priced on their size, how many tenancies they hold and the standard of fit-out, which explains the wide $1,100–$3,500+ band. The ATO says capital works rates depend on when construction began, the type of works and how they are used, so give the surveyor the building's history and current use when you ask for a quote.
How to Keep the Quantity Surveyor Cost Sane in Hobart
Quantity Surveyor Cost in Hobart to Check a Home's Insured Rebuild Value
Owners who doubt the sum insured on their house can have it tested. A quantity surveyor's insurance replacement-cost report puts a figure on rebuilding the home as it stands, and in Hobart it costs $450–$1,100.
It suits houses that are hard to price from an online calculator: steep sites, heritage features, or large extensions. Ask whether the figure includes demolition and site clearing, and send the surveyor your policy schedule so the report uses the same headings as your insurer.
Quantity Surveyor Cost in Hobart by Report Type
Hobart is a city of houses, and the row a house falls in depends on what came with it. If a recent Kingston home has its contract and invoices filed, it can be scheduled from them at $300–$450. If an older house in New Town or Moonah has no construction records, it has to be measured on site at $500–$800, with every item of plant counted. A shop with a flat above is a different product at $1,100–$3,500+, priced on size, tenancies and fit-out. More rooms and more plant push a house from the first row toward the second.
Within a row, the Hobart fee moves with what has to be counted and how the building is used. A house with more rooms holds more plant to list, which lengthens the visit. For a commercial building, the surveyor wants the building's history and current use, because those shape the report. A rebuild figure at $450–$1,100 is priced on today's cost to rebuild, not the original outlay, so it sits beside a schedule rather than replacing it. Before signing, ask that the plant schedule be included, that later purchases can be added, and that the delivery date is written in.
Quantity Surveyor Cost in Hobart: What the Quote Should Include
In Hobart a quote for a depreciation schedule should show that the plant, meaning items like the dishwasher, air conditioners, stoves and curtains, is listed alongside the building, since one report can cover both. It should also say whether the surveyor is working from your builder's contract and invoices or coming to the house.
- Which row: $300–$450 working from the builder's contract and invoices, or $500–$800 with the surveyor measuring the house in person.
- A schedule of plant listed apart from the building's structure in the same report, with each item named.
- A note on how plant that came with the house will be treated, which depends on how and when the house was bought.
- For a house in Glenorchy, Kingston or Howrah, the room count the fee assumed, since more rooms mean more fittings to count.
- A rebuild figure at $450–$1,100 on its own line, and whether both reports come from a single site visit.
- For a strata scheme, the sinking fund forecast priced separately, with the lot count stated.
- For a shop with a flat above, the size, the number of tenancies and the fit-out standard behind the $1,100–$3,500+ fee.
- The delivery date in writing, and what it costs to add plant you buy later, such as a new oven, to the schedule.
- GST on its own line; ask your accountant how the fee is treated.
Frequently Asked Questions
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →