Quantity Surveyor Cost in Wollongong (2026)
Wollongong owners hire a quantity surveyor for three different reasons, and each has its own line in our table. A development application needs a cost estimate, which sits in the $1,500–$6,000+ band alongside cost plans and sinking fund forecasts. A rental needs a depreciation schedule: $350–$500 when it is prepared from plans and photos, or $550–$900 with a site visit. An insurance rebuild figure costs $500–$1,200, and a commercial or mixed-use schedule $1,200–$4,000+. Knowing which one you are asking for is the first step to a quote you can compare.
Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?
Detailed Pricing — Quantity Surveyor Cost in Wollongong 2026
| Tier | Typical fee | What it funds |
|---|---|---|
| Desktop / self-assessed depreciation schedule | $350–$500 | No site visit. Suits newer builds with documented costs. |
| Full-inspection residential schedule | $550–$900 | QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible. |
| Commercial / mixed-use schedule | $1,200–$4,000+ | Offices, retail, industrial. Priced on floor area and fit-out complexity. |
| Insurance replacement-cost report | $500–$1,200 | Rebuild valuation for strata or owner insurance. |
| Cost plan / sinking fund / DA cost report | $1,500–$6,000+ | Construction estimating for developers, strata committees and council submissions. |
| Progress claim / bank drawdown assessment | $500–$1,800 | Per claim. The surveyor checks the builder's progress claim against the work done. |
| Hourly quantity surveying advice | $100–$350 per hour | Ad hoc advice, cost reviews or help with a dispute, billed by the hour. |
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
What Moves the Quantity Surveyor Cost in Wollongong
- Why the DA figure matters. NSW uses a project's estimated development cost to set its planning pathway and to calculate regulated fees, including the council's development application fee (NSW Planning). The figure in the report feeds straight into what you pay council and how the application is assessed, which is why it pays to have it prepared properly rather than guessed.
- Projects over the line. Once a NSW project is costed above $3 million, NSW Planning says the cost report should be prepared by a qualified quantity surveyor who is a member of AIQS or RICS, follow the AIQS practice standard and use the standard form. NSW Planning asks that the report carry a date inside the 30 days leading up to lodgement. Bigger projects mean more measuring, which is why that band in our table has no fixed ceiling.
- Smaller renovations and additions. Under $3 million, NSW Planning recommends a cost estimate report and leaves the detail to each council. For work costed between $100,000 and $3 million, the NSW planning circular says a suitably qualified person should estimate the cost, and that list includes a builder licensed for the work, a registered architect, an accredited building designer or a quantity surveyor. Check what your council asks for before you pay for a full report.
- What the report includes. A development cost report covers designing and building the work, any demolition and fixed or mobile plant. It leaves out land, developer contributions, work that needs a separate approval and ongoing running costs, and NSW Planning recommends showing totals both excluding and including GST. A brief that mixes these up takes longer to sort, so send clear plans and a scope with your request.
- Rentals in a mixed market. Wollongong's housing is 71.3% separate houses, 12.9% semi-detached homes and townhouses and 14.8% flats (ABS 2021 Census), and 29.3% of households rent, at a median $400 a week. A newer apartment with good build records may suit a desktop schedule at $350–$500; a house or older townhouse without paperwork usually needs the surveyor on site.
- Construction cost, not price paid. Capital works on a rental are claimed on what the building cost to construct, and the ATO will not accept the purchase price, insured cost or replacement cost in its place. The evidence has to be receipts or a report by an appropriately qualified person. The ATO adds that valuers, agents, accountants and solicitors generally lack the qualifications to make that estimate unless otherwise qualified.
- Insurance and strata forecasts. An insurance replacement-cost report ($500–$1,200) prices a rebuild for your cover, a separate number from anything in a tax schedule. Owners in apartment and townhouse buildings may also meet a quantity surveyor through a sinking fund forecast for the owners corporation, which is priced in the same band as cost plans and development reports.
How to Keep the Quantity Surveyor Cost Sane in Wollongong
Quantity Surveyor Cost in Wollongong for a Shop with a Flat Above
A building that mixes a shop and a home does not fit the residential rows. In Wollongong it is quoted as a commercial or mixed-use schedule, $1,200–$4,000+, with the fee set by floor area and the fit-out.
Ask whether the quote treats the two parts as one schedule or two, and whether the flat upstairs could be done on the residential inspection row, $550–$900, if it is on its own title. Clear answers here stop the job being re-quoted halfway through.
Quantity Surveyor Cost in Wollongong by Report Type
Wollongong housing mixes houses, semis, townhouses and flats, and the rows split along that line. If a newer Wollongong apartment has its build records, it can be scheduled from paper at $350–$500, while a house in Dapto or an older townhouse in Figtree with nothing on file needs the surveyor on site at $550–$900. A developer lodging an application is buying something else again at $1,500–$6,000+, priced on the size of the project and what the council asks to see. Paperwork moves a home between the residential rows; project size moves a cost report up its band.
Within $1,500–$6,000+, the Wollongong fee moves with the scope the surveyor has to measure: a report that mixes land, contributions and running costs into the build figure takes longer to untangle, so send clean plans and a written scope with the request. Within $1,200–$4,000+, a shop or office is priced on its area, tenancies and fit-out. Before you sign, ask what cost evidence your council wants for a smaller job, ask for both GST totals, and ask whether a schedule and a rebuild figure can be measured on one trip.
Quantity Surveyor Cost in Wollongong: What the Quote Should Include
In Wollongong a DA cost report's figure drives the council fee and the assessment pathway, so the quote should state exactly what the report covers, what it leaves out, and that totals are shown both without and with GST. The same discipline applies to a schedule for a Figtree or Dapto rental.
- The row: $350–$500 for a newer apartment with good build records, or $550–$900 for a house or townhouse with no paperwork.
- For a DA cost report at $1,500–$6,000+, the inclusions: designing and building the work, demolition, and fixed or mobile plant.
- The exclusions listed: land, developer contributions, work approved separately and ongoing running costs.
- Two totals on the cost report, one without GST and one with it, each on its own line.
- The plans, scope of works and any demolition the surveyor priced the fixed fee from, so a changed scope is repriced rather than argued.
- For an owners corporation in Thirroul or Shellharbour, a check for an existing sinking fund forecast before a fresh one is priced.
- A rebuild figure for cover at $500–$1,200 on its own line, measured on the same trip as the schedule if the quote says so.
- The delivery date in writing, timed to the lodgement, and the charge for a schedule update after later work.
- GST on its own line for every report; ask your accountant how the fee is treated.
Frequently Asked Questions — Quantity Surveyor Cost in Wollongong
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →