Quantity Surveyor Cost in Geelong (2026)
Geelong owners usually call a quantity surveyor for one of three jobs: a depreciation schedule for an investment property, a rebuild estimate for the insurer, or pricing a build or renovation before it starts. Working from plans and photos, the fee is $350–$500; a schedule with the surveyor measuring on site is $500–$850. Expect $500–$1,150 for a rebuild estimate, and $1,150–$4,000+ for shopfronts, offices and mixed-use sites. Project work such as cost planning, sinking fund forecasting and development cost reporting spans $1,450–$5,500+, a wide band since bigger projects take more measuring and pricing.
Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?
Detailed Pricing — Quantity Surveyor Cost in Geelong 2026
| Tier | Typical fee | What it funds |
|---|---|---|
| Desktop / self-assessed depreciation schedule | $350–$500 | No site visit. Suits newer builds with documented costs. |
| Full-inspection residential schedule | $500–$850 | QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible. |
| Commercial / mixed-use schedule | $1,150–$4,000+ | Offices, retail, industrial. Priced on floor area and fit-out complexity. |
| Insurance replacement-cost report | $500–$1,150 | Rebuild valuation for strata or owner insurance. |
| Cost plan / sinking fund / DA cost report | $1,450–$5,500+ | Construction estimating for developers, strata committees and council submissions. |
| Progress claim / bank drawdown assessment | $500–$1,700 | Per claim. The surveyor checks the builder's progress claim against the work done. |
| Hourly quantity surveying advice | $100–$350 per hour | Ad hoc advice, cost reviews or help with a dispute, billed by the hour. |
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Geelong? Get a quote from a local quantity surveyor — free, no obligation.
Get Geelong quotes →What Moves the Quantity Surveyor Cost in Geelong
- Geelong's rental homes. Renters make up 27.5% of Geelong households, a little under the Victorian 28.5%, and the middle rent sits at $350 a week (ABS 2021 Census). Behind every rented home is an owner with a possible claim for capital works and for the declining value of fittings. A depreciation schedule puts numbers on that claim, so ask your accountant whether it is likely to outweigh the surveyor's fee.
- Desktop or a site visit. Separate houses are 86.7% of Geelong dwellings (ABS 2021 Census). A recent house with the builder's contract and invoices on file can sometimes be scheduled from documents at $350–$500. An older house, or one with extensions nobody kept records for, is better costed with a site inspection at $500–$850, because the build cost has to be estimated part by part.
- No record of build cost. The ATO bases capital works on construction cost, never on the price you paid. If those records are lost, it will accept an estimate by a quantity surveyor or other independent person with the right qualifications. It also says valuers, agents, accountants and solicitors are generally not equipped to make that estimate unless they hold other qualifications, so a property valuation does not do the same job.
- Insurance rebuild figures. An insurer's rebuild report, $500–$1,150 in our table, tells you what a rebuild would take today. For capital works the ATO refuses both the insured cost and the replacement cost as a stand-in for construction cost, so this report cannot double as a depreciation schedule. Needing both? Ask whether a single site visit can produce them.
- Fittings and second-hand assets. Fittings that are separately identifiable and do not form part of the building structure count as depreciating assets, claimed apart from capital works, and a surveyor can list them in the same report. For an established rental, the ATO's treatment of second-hand assets hinges on how and when you came to own the property, so get the surveyor to check that before paying for the full schedule.
- Renovations and shared buildings. A cost plan prices a renovation, extension or new build before work begins, which is the job to ask for when you are weighing up a kitchen or a second storey. A sinking fund forecast sets out the repair and replacement costs a shared building should save for. Semi-detached homes are 10.3% of Geelong dwellings (ABS 2021 Census); for a townhouse group, give the surveyor the lot count and the age of the shared areas when requesting a quote.
- Commercial jobs and travel. A shop, office or mixed-use building is not sold as a fixed-price product; the quote depends on its size, how many tenancies it holds and how it is fitted out, which is why commercial quotes run across $1,150–$4,000+. If the surveyor you choose is not based in Geelong, ask whether a site visit carries a travel charge or whether a desktop job will do.
How to Keep the Quantity Surveyor Cost Sane in Geelong
Quantity Surveyor Cost in Geelong for a Landlord with Several Properties
A schedule is prepared property by property, so a landlord with several pays the fee several times. Newer Geelong properties with documented build costs can go on the desktop row, $350–$500; older ones need the visit, at $500–$850.
Sort the portfolio into those two groups before you call, and ask whether ordering them together earns a lower price per schedule. Also ask how long each report takes, so they are back before your accountant needs them.
Quantity Surveyor Cost in Geelong by Report Type
Geelong is a city of separate houses, and the row a house falls in depends on its paper trail. If a recently built home in Armstrong Creek or Waurn Ponds has the contract and invoices filed, it can be scheduled from documents at $350–$500. If an older house in Newtown or Belmont has an extension nobody kept receipts for, it is costed piece by piece on site at $500–$850. A rebuild figure for the insurer is a separate report at $500–$1,150 and cannot double as a schedule. Records, not the suburb, move a house between the residential rows.
Within a row, Geelong fees move with the building's history and the surveyor's travel. A house with extensions nobody recorded is costed one piece at a time, and a visit from outside Geelong may carry a travel charge. A townhouse group's sinking fund forecast inside $1,450–$5,500+ is priced on how many lots there are and how old the shared areas are. Before signing, ask whether second-hand fittings will be checked first, whether the schedule includes the fittings as well as the structure, and what the delivery date is.
Quantity Surveyor Cost in Geelong: What the Quote Should Include
In Geelong an itemised quote shows whether the surveyor is pricing from the builder's contract and invoices you hold or from a walk through the house, and whether the fee covers the extensions nobody kept records for. It also keeps a cost plan for a kitchen or second storey separate from a depreciation schedule.
- The row: $350–$500 for a recent house whose builder's contract and invoices are on file, or $500–$850 for an older home or one with undocumented extensions.
- If the surveyor is not based in Geelong, a line stating whether the visit to Lara, Ocean Grove or Armstrong Creek carries a travel charge.
- The construction figure for the building and the fittings list as two named parts of the same report.
- For an established rental, a note that second-hand fittings will be checked before the full schedule is priced.
- A rebuild figure for the insurer as its own line at $500–$1,150, and whether one site visit produces both reports.
- For a renovation or extension, a cost plan priced from the drawings before work starts, listed apart from the schedule.
- For a townhouse group, the number of lots and the age of the shared areas that the sinking fund forecast fee assumes.
- The delivery date in writing, and the fee for an updated schedule after the builder hands over an extension.
- GST on its own line; ask your accountant how the fee is treated.
Frequently Asked Questions
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →