Updated October 2026· Independently researched·8 min read
A quantity surveyor's tax depreciation schedule costs $600–$1,000 for a full-inspection residential report in Darwin in 2026, $400–$550 desktop, and $1,300–$4,500+ for commercial property; insurance valuations run $550–$1,300 and construction cost plans $1,650–$6,500+.
A quantity surveyor measures and costs buildings. For most property owners in Darwin that means a tax depreciation schedule for an investment property, an insurance replacement-cost report, or a construction cost plan.
Quick answerA quantity surveyor's tax depreciation schedule costs $600–$1,000 for a full-inspection residential report in Darwin in 2026, $400–$550 desktop, and $1,300–$4,500+ for commercial property; insurance valuations run $550–$1,300 and construction cost plans $1,650–$6,500+. Get free Darwin quotes →
Detailed Pricing — Quantity Surveyor Cost in Darwin 2026
+2.5%
Tier
Typical fee
What it funds
Desktop / self-assessed depreciation schedule
$400–$550
No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule
$600–$1,000
QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule
$1,300–$4,500+
Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report
$550–$1,300
Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report
$1,650–$6,500+
Construction estimating for developers, strata committees and council submissions.
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no middleman.
Getting quotes for Quantity Surveyor work in Darwin? Get a quote from a verified local quantity surveyor — free, no obligation.
What Actually Moves the Quantity Surveyor Cost in Darwin
Desktop vs inspection. A desktop schedule uses plans and photos; a full-inspection schedule sends a QS to site and finds more.
Property type. Residential is a fixed-price product; commercial and mixed-use is priced on floor area and fit-out.
Age and renovation history. Older properties with undocumented renovations take longer to assess.
Report type. A depreciation schedule, an insurance valuation and a DA cost plan are different products at different price points.
Location. Regional travel adds to inspection-based reports.
How to Keep the Quantity Surveyor Cost Sane in Darwin
1
Order before 30 June so the first claim lands in this financial year.
2
Ask whether a desktop schedule is enough for a newer build with documented costs.
3
Bundle an insurance valuation with the inspection if you need both; one site visit.
4
Claim the fee: The report cost is 100% deductible in the year you pay it.
5
Keep the schedule: It's a one-off that your accountant uses for 40 years.
Frequently Asked Questions — Quantity Surveyor Cost in Darwin
How much does a depreciation schedule cost in Darwin?
A full-inspection residential schedule is typically $600–$1,000, a desktop schedule $400–$550, and commercial property $1,300–$4,500+ depending on size.
Is the quantity surveyor's fee tax deductible?
Yes. The cost of preparing a depreciation schedule is fully deductible in the year it's paid.
How long does a depreciation schedule last?
The report covers the remaining life of the building allowance, up to 40 years. You order it once.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
What changed in May 2017?
Second-hand plant and equipment in residential properties bought after 9 May 2017 generally can't be depreciated. Capital works on the building itself still can.
What's an insurance replacement-cost report?
A QS valuation of what it would cost to rebuild the property today, used to set strata or owner insurance sums and avoid under-insurance.
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed October 2026. Read our full methodology →
Compare Quantity Surveyor Cost in Darwin with Related Guides