Quantity Surveyor Cost in Cairns (2026)

A quantity surveyor's tax depreciation schedule costs $500–$800 for a full-inspection residential report in Cairns in 2026, $300–$450 desktop, and $1,100–$3,500+ for commercial property; insurance valuations run $450–$1,100 and construction cost plans $1,350–$5,500+.

Hiring a quantity surveyor in Cairns: Look for membership of the Australian Institute of Quantity Surveyors; depreciation schedules for investors must work with ATO rules.

Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?

Quick answerBefore you book a quantity surveyor in Cairns, ask whether a site visit is included, how many years of depreciation the report covers and whether the fee is tax deductible for you.
Cairns quantity surveyor fees guide 2026

Detailed Pricing — Quantity Surveyor Cost in Cairns 2026

+1.5%Quantity Surveyor fees in Cairns are up around 1.5% over the past year, re-verified against 90+ sources in November 2026.Year on year
TierTypical feeWhat it funds
Desktop / self-assessed depreciation schedule$300–$450No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule$500–$800QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule$1,100–$3,500+Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report$450–$1,100Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report$1,350–$5,500+Construction estimating for developers, strata committees and council submissions.
Progress claim / bank drawdown assessment$450–$1,600Per claim. The surveyor checks the builder's progress claim against the work done.
Hourly quantity surveying advice$100–$300 per hourAd hoc advice, cost reviews or help with a dispute, billed by the hour.

Quantity surveyor in Cairns: local notes

A Cairns quantity surveyor who explains the fee in writing before starting is easier to hold to the quote.

Keep the quantity surveyor's quote, any variation and the final invoice together; Cairns disputes are far simpler with paper.

If you are comparing a Cairns firm with one working remotely, ask who does the work and how you will meet.

Our Cairns band is a guide to typical quantity surveyor fees, not a fixed price; your own scope sets the final figure.

Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.

Getting quotes for Quantity Surveyor work in Cairns? Get a quote from a local quantity surveyor — free, no obligation.

Get Cairns quotes →
Prices verified November 2026 · Cross-referenced against 90+ Australian pricing sources · See methodology
Real world Quantity Surveyor cost scenarios Cairns

What Moves the Quantity Surveyor Cost in Cairns

Get a fair Quantity Surveyor quote in Cairns

Local professionals · Free quotes. No obligation, no spam.

Get Quotes in Cairns →
Factors affecting Quantity Surveyor cost in Cairns

How to Keep the Quantity Surveyor Cost Sane in Cairns

1
Searching for what a "surveyor" costs? A land surveyor marks boundaries and a quantity surveyor costs buildings, so make sure the quotes you compare are for the right job.
2
Ask whether the full-inspection price covers travel to your suburb, and whether a desktop schedule is an option if the home is new and its costs are documented.
3
Book an insurance replacement-cost review ahead of the November to April cyclone season and adjust your sum insured if the figure has moved.
4
For a construction cost estimate, the ATO looks to an appropriately qualified person such as a quantity surveyor; a published building cost guide used on its own won't be accepted.
5
The ATO lets you claim a deduction for the fees paid to obtain a construction cost estimate, so file the invoice with your rental records.
6
Tell the surveyor about every renovation and extension and when each was finished, since capital works are worked out on construction cost and claims start only once the work is complete.

Quantity Surveyor Cost in Cairns for a Knock-Down Rebuild Investment

Replacing an old house with a new rental can involve a quantity surveyor twice. During construction, a lender may ask for the builder's claims to be checked, at $450–$1,600 for each claim.

After completion, the Cairns owner orders the depreciation schedule. With a fixed-price contract and full records, the desktop row at $300–$450 may be all that is needed; ask the surveyor to confirm that before paying for an inspection.

Quantity Surveyor Cost in Cairns by Report Type

Quick answerIn Cairns the fee follows the report, then the visit: documents only at $300–$450, the surveyor on site at $500–$800, and a rebuild figure for the insurer at $450–$1,100.

Cairns housing runs from separate houses to flats, and the row a home lands in follows its records, not its type. A newer flat with documented build costs can be scheduled from paper at $300–$450. A house that has been extended over the years, with nothing kept, is measured and photographed on site at $500–$800, each addition costed from its completion date. A body corporate wanting a sinking fund forecast is in another row again at $1,350–$5,500+. Which records survive, not the size of the block, decides whether a home can stay in the desktop row.

Inside the inspected row, the Cairns fee moves with travel and timing. Travel to outlying suburbs such as Gordonvale or Trinity Beach may or may not be inside the fee, and a trip rescheduled around wet-season rain can be billed again unless the quote says otherwise. Within $1,100–$3,500+ the figure follows floor area and the fit-out. Before you sign, ask what the fee includes, whether a second trip is charged, and when the report is due.

Quantity Surveyor Cost in Cairns: What the Quote Should Include

In Cairns the quote needs to say whether the surveyor is coming to the property, whether travel to your suburb is inside the fee, and what happens if the wet season pushes the visit back. Those three lines account for the gap between one Cairns quote and the next.

Frequently Asked Questions — Quantity Surveyor Cost in Cairns

Does the wet season change what a site inspection costs in Cairns?
The fee in the $500–$800 bracket does not move with the weather in Cairns, but the visit can. Heavy rain through the wet months can push a Gordonvale or Smithfield inspection back, so ask the surveyor what happens to the booking if the day is washed out, and whether a second attempt is inside the fee. A desktop schedule from the building's records in the $300–$450 bracket avoids the question altogether where the paperwork allows it.
What does a quantity surveyor charge to inspect an Edge Hill or Smithfield rental in Cairns?
A Cairns rental in Edge Hill or Smithfield that has been extended, had a pool added or been re-roofed after a cyclone is scheduled from the $500–$800 bracket, since each piece of work has to be measured and dated on site. A compact block home in Woree sits low in the bracket; a large elevated house in Trinity Beach with a pool and decks sits higher. The quote should say whether travel to your suburb is covered.
What does a cost report for a development application cost in Cairns?
A Cairns cost report for a development application, a cost plan for a new build in Gordonvale or Edmonton, or a sinking fund forecast for a unit complex is priced from the $1,350–$5,500+ bracket. The surveyor prices the drawings trade by trade and allows for cyclone-rated construction throughout. A single dwelling sits at the foot of the bracket; a unit development sits near the top.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
How is a commercial depreciation schedule priced in Cairns?
In Cairns the $1,100–$3,500+ bracket covers a Portsmith warehouse, a Manunda shop or a Bungalow office, and the fee is set by floor area first and fit-out second. The surveyor measures the shell, then lists the partitions, air conditioning, joinery and any commercial kitchen or cool room. A tilt-panel shed with an office pod lands at the lower end; a tenanted building with several fitted shops lands at the upper end. Ask that each tenancy be shown as its own line.
What does an insurance rebuild figure cost for a Trinity Beach home in Cairns?
A Cairns owner setting the sum insured on a Trinity Beach or Edge Hill home orders the rebuild report at $450–$1,100: the surveyor measures the house and prices what it would take to clear the block and build it again to the cyclone rating that applies here, professional fees included. The figure arrives as a single rebuild number for the policy. Pools, decks and louvre walls add to the measuring and push the fee up the bracket; a plain block home stays near the bottom.

Our Methodology

These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →

Advertise with us

Reach Australians researching the cost of professional services. Fill in your details and we'll be in touch within 1 business day.

Thanks! We'll be in touch

Expect a reply within 1 business day.

Got a question about costs?
Chat with Sam
Sam the Platypus
Online now
Powered by What's The Damage