Independent Australian Cost Guides
Updated November 2026

Quantity Surveyor Cost in Brisbane (2026)

A quantity surveyor's tax depreciation schedule costs $500–$850 for a full-inspection residential report in Brisbane in 2026, $350–$500 desktop, and $1,150–$4,000+ for commercial property; insurance valuations run $500–$1,150 and construction cost plans $1,450–$5,500+.

Hiring a quantity surveyor in Brisbane generally comes down to one of three reports: a depreciation schedule to back tax claims on an investment property, a rebuild figure for insurance, or a cost plan for a project. A schedule drawn up from drawings and photographs costs $350–$500 on our table, and adding a site visit takes it to $500–$850. Insurance replacement-cost reports run $500–$1,150. Budgets for building projects, development cost reports and body corporate sinking fund plans cover $1,450–$5,500+, with commercial or mixed-use work at $1,150–$4,000+; both are sized to the job. A quantity surveyor costs buildings; boundary and contour work belongs to a land surveyor, a different profession.

Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?

Quick answerA quantity surveyor's tax depreciation schedule costs $500–$850 for a full-inspection residential report in Brisbane in 2026, $350–$500 desktop, and $1,150–$4,000+ for commercial property; insurance valuations run $500–$1,150 and construction cost plans $1,450–$5,500+. Get free Brisbane quotes →
Brisbane quantity surveyor fees guide 2026

Detailed Pricing — Quantity Surveyor Cost in Brisbane 2026

+2.0%Quantity Surveyor fees in Brisbane are up around 2.0% over the past year, re-verified against 90+ sources in November 2026.Year on year
TierTypical feeWhat it funds
Desktop / self-assessed depreciation schedule$350–$500No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule$500–$850QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule$1,150–$4,000+Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report$500–$1,150Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report$1,450–$5,500+Construction estimating for developers, strata committees and council submissions.
Progress claim / bank drawdown assessment$500–$1,700Per claim. The surveyor checks the builder's progress claim against the work done.
Hourly quantity surveying advice$100–$350 per hourAd hoc advice, cost reviews or help with a dispute, billed by the hour.
Step 1 of 2

What do you need a callback about?

One tap — we'll show you the going rate, then take your number.

You're in.

A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.

Getting quotes for Quantity Surveyor work in Brisbane? Get a quote from a local quantity surveyor — free, no obligation.

Get Brisbane quotes →
Prices verified November 2026 · Cross-referenced against 90+ Australian pricing sources · See methodology

Brisbane quantity surveyors: house surveys and construction cost reports

A house survey in Brisbane

This page prices quantity surveyors, who report on costs and depreciation, and it has no rows for surveying land or a house's boundaries, so we don't publish a house-survey price. The nearest line for a home is a full-inspection depreciation schedule at $500–$850.

Construction cost reports in Brisbane

For building work, our Brisbane table prices a cost plan, sinking-fund or DA cost report at $1,450–$5,500+, and a rebuild valuation for insurance at $500–$1,150.

These answers use the prices in the table on this page.

Real world Quantity Surveyor cost scenarios Brisbane

What Moves the Quantity Surveyor Cost in Brisbane

Get a fair Quantity Surveyor quote in Brisbane

Local professionals · Free quotes. No obligation, no spam.

Get Quotes in Brisbane →
Factors affecting Quantity Surveyor cost in Brisbane

How to Keep the Quantity Surveyor Cost Sane in Brisbane

1
According to the ATO, a quantity surveyor's report can be prepared when you buy a rental, so it is worth booking one as your Brisbane purchase settles.
2
Building or extending? No capital works claim can begin until construction is finished, so ask the surveyor when the final schedule should be prepared.
3
After an affordable option? Check if the desktop tier is enough; a newer home with full build records may not need a site visit at all.
4
Fees for estimating construction cost are deductible, the ATO says, so pass the surveyor's invoice to your accountant with your other rental records.
5
Store the schedule safely for the long haul: the ATO's general rule spreads capital works claims across 40 years from when building finished.
6
Searching for a house survey? Check which professional you need first: boundary, contour and topographical surveys are land surveying work and are quoted separately from anything on this page.

Quantity Surveyor Cost in Brisbane When You Build a Duplex on a Bank Loan

Building a duplex with borrowed money can bring a quantity surveyor in at each payment. Where the lender wants the builder's claim checked before it releases funds, each assessment is $500–$1,700, charged per claim.

The same Brisbane owner may want a second product once tenants move in: a depreciation schedule, at $350–$500 if the build costs are fully documented. Ask whether one firm will quote both, and whether the claims are priced singly or as a set.

Affordable Depreciation Schedule Cost in Brisbane: Quantity Surveyor Prices

The most affordable quantity surveyor option in Brisbane is a desktop or self-assessed depreciation schedule, at $350–$500. It is prepared from plans, photos and the owner's details without a site visit.

A full-inspection residential schedule costs $500–$850 in Brisbane, and is worth the step up for an older property or one with recent renovations, where a site visit can pick up items a desktop schedule misses. A commercial or mixed-use building costs $1,150–$4,000+.

Cost consultant work for builders and developers, such as a cost plan, a sinking fund forecast or a development application cost report, is priced at $1,450–$5,500+. Ask how quickly each report is delivered and what the surveyor needs from the owner first.

Quantity Surveyor Cost in Brisbane by Report Type

Quick answerIn Brisbane the fee follows two choices: the report type, then whether the surveyor comes out. A schedule from paperwork sits at $350–$500, the same house inspected in person at $500–$850, and shops or offices move to $1,150–$4,000+.

If a New Farm apartment came with the developer's cost breakdown, it can be scheduled from those records at $350–$500. If a Paddington house was changed after it went up, the alterations have to be dated and costed part by part on site, which is $500–$850. A rebuild figure for the same house is a third product at $500–$1,150, priced on what it would take to put the home up again today. Thin paperwork and change since construction, not the suburb, are what push a Brisbane home out of the desktop row.

Within the inspected row, larger houses take longer, and Brisbane has plenty of homes with four or more bedrooms, each holding more to measure and photograph. Within $1,150–$4,000+ the fee moves with floor area, the number of tenancies and how developed the drawings are. Before you sign, ask whether the fittings list comes with the building figure, whether second-hand fittings will be checked, when the report is due, and how an update after a renovation is charged.

Quantity Surveyor Cost in Brisbane: What the Quote Should Include

A Brisbane quote should separate the walk-through from the paperwork job, since the two residential rows differ only in whether the surveyor comes to the house. It should also state that it prices a depreciation schedule or a cost report, not a boundary or house survey, so you are not weighing one profession's fee against another's.

Frequently Asked Questions

How much does a quantity surveyor cost in Brisbane?
In our Brisbane table: a full-inspection residential schedule $500–$850, a cost plan, sinking fund or DA cost report $1,450–$5,500+ and an insurance replacement-cost report $500–$1,150.
What does a quantity surveyor charge to inspect a Paddington rental in Brisbane?
A Brisbane timber home in Paddington or Bulimba that has been raised, built in underneath or re-roofed over the years is scheduled from the $500–$850 bracket, because nobody holds invoices for all of that work. The surveyor measures each stage, dates it and lists the fittings. A compact post-war cottage sits near the bottom of the bracket; a large house with a pool, deck and granny flat moves up.
What does construction cost planning cost in Brisbane?
Cost planning for a Brisbane build or renovation is priced from the $1,450–$5,500+ bracket. The surveyor takes the drawings for a West End renovation or a small unit development and prices the trades, preliminaries and contingencies, so you have an estimate before builders tender. The fee rises with the size of the project and the number of design revisions you want re-priced. Ask whether the estimate is updated once the builder's quotes are in or whether that is a second fee.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
Does the Brisbane table price a house survey or only quantity surveying?
The Brisbane table has no line for a house or boundary survey, because marking land and measuring a block is a land surveyor's work. What it prices is building cost reporting: the $500–$850 bracket for a home the surveyor walks through, and the $1,150–$4,000+ bracket for a shop or office priced on floor area. Searching for a surveyor in Brisbane, check which of the two trades you are being quoted by before comparing fees.
What does a rebuild valuation for insurance cost in Brisbane?
In Brisbane the $500–$1,150 bracket pays for a surveyor to work out what it would take to demolish and rebuild the property today, so the sum insured on a house or body corporate policy is set from measurement rather than a guess. Stumps, stairs and wide verandahs on a raised Paddington timber home all add to what has to be measured and priced, which moves the fee within the bracket. Ask for it to be done on the same visit as the depreciation inspection to share the call-out.

Our Methodology

These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →

Advertise with us

Reach Australians researching the cost of professional services. Fill in your details and we'll be in touch within 1 business day.

Thanks! We'll be in touch

Expect a reply within 1 business day.

Got a question about costs?
Chat with Sam
Sam the Platypus
Online now
Powered by What's The Damage