Quantity Surveyor Cost in Canberra (2026)
Most Canberra searches for a quantity surveyor are really about one document: a tax depreciation report on an investment property. Built from drawings, photos and paperwork, that schedule costs $400–$550 in our table; with a surveyor on site measuring the home it is $600–$1,000. Owners who also want a rebuild figure for their insurer pay $550–$1,300 for that report, and project budgets, strata sinking fund plans and development cost reports run $1,650–$6,500+. Across the ACT, which of the first two tiers fits often comes down to the dwelling, and townhouses, duplexes and apartments make up a bigger share of homes here than they do nationally.
Comparing cities, or after the Australia-wide picture? See the national guide: How much does a quantity surveyor cost in Australia?
Detailed Pricing — Quantity Surveyor Cost in Canberra 2026
| Tier | Typical fee | What it funds |
|---|---|---|
| Desktop / self-assessed depreciation schedule | $400–$550 | No site visit. Suits newer builds with documented costs. |
| Full-inspection residential schedule | $600–$1,000 | QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible. |
| Commercial / mixed-use schedule | $1,300–$4,500+ | Offices, retail, industrial. Priced on floor area and fit-out complexity. |
| Insurance replacement-cost report | $550–$1,300 | Rebuild valuation for strata or owner insurance. |
| Cost plan / sinking fund / DA cost report | $1,650–$6,500+ | Construction estimating for developers, strata committees and council submissions. |
| Progress claim / bank drawdown assessment | $550–$2,000 | Per claim. The surveyor checks the builder's progress claim against the work done. |
| Hourly quantity surveying advice | $100–$400 per hour | Ad hoc advice, cost reviews or help with a dispute, billed by the hour. |
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Canberra? Get a quote from a local quantity surveyor — free, no obligation.
Get Canberra quotes →What Moves the Quantity Surveyor Cost in Canberra
- Townhouses and apartments. Townhouses, duplexes and other semi-detached dwellings make up 17.2% of ACT homes, and flats or apartments 19.4%, each higher than the Australian figure (12.6% and 14.2%, ABS 2021 Census). A recent unit with complete builder records is the sort of job a desktop schedule at $400–$550 is designed for, so check with the surveyor that your unit fits that description before you pay for a site visit.
- Why the build cost matters. For capital works, the ATO bases the deduction on the original construction outlay; your purchase price, its insured value and its replacement value are all ruled out as substitutes. Receipts from the original build leave the surveyor less to estimate. When the vendor handed over nothing, the figure has to be rebuilt from the property itself, which is the work an inspected schedule at $600–$1,000 pays for.
- Buying off the plan. Capital works claims can only begin once construction is complete, so an off-the-plan buyer orders the schedule after handover, not at exchange. The ATO's own examples show investors in brand-new units engaging a quantity surveyor to list every depreciating asset they can claim, such as curtains and furniture installed before settlement, where no one has lived in the property before.
- Four-bedroom houses. More than a third of ACT homes (35.8%, ABS 2021 Census) have at least four bedrooms. A big house holds more rooms to measure and more carpets, appliances and window coverings to list, so it tends to land higher in the inspected-schedule band than a compact unit does. Don't expect the garden to lift the claim: the ATO notes general landscaping may not qualify for capital works deductions.
- Insurance rebuild figure. An insurance replacement-cost report deals with rebuilding, not tax: it estimates the cost of putting the home back up at today's prices. On its own it costs $550–$1,300. Because the ATO rules replacement cost out as a construction cost, the insurance figure cannot double as your tax figure, but one site visit can often gather what both reports need, so ask for a combined price.
- Development and sinking fund reports. Project budgets, strata sinking fund plans and DA cost reports have a band of their own, $1,650–$6,500+, and where a job lands in it depends on how big and involved the project is. If you need a quote for a DA report, send the drawings, the site address and the purpose of the report, and ask the surveyor to confirm what the ACT planning authority expects to see before work starts.
- Shops, offices and mixed use. No two commercial jobs are alike: the surveyor quotes each one on its floor area, number of tenancies and fit-out, so the $1,300–$4,500+ band is open-ended at the top. For a building used as a shop or office, the ATO rate depends on the type of building and when construction began, so give the surveyor the build date and any approval records you hold.
How to Keep the Quantity Surveyor Cost Sane in Canberra
Quantity Surveyor Cost in Canberra When You Question a Builder's Variation
Not every job is a report. When a builder presents a variation or a claim that looks high, a quantity surveyor can review it by the hour, at $100–$400 per hour.
For a Canberra owner part-way through a build, a formal check of a progress claim against the work done is the fixed-fee alternative, $550–$2,000 per claim. Ask for an estimate of hours before the review starts, and send the contract, drawings and the claim together so no time is spent chasing papers.
Quantity Surveyor Cost in Canberra by Report Type
Canberra has a large share of townhouses and apartments, and a recent one in Woden or Gungahlin with complete builder records is the job $400–$550 is built for. A four-bedroom house in Tuggeranong with no records from the original build has its figure rebuilt from the property itself at $600–$1,000, and more rooms mean more window coverings, appliances and floor coverings to itemise. A sinking fund plan or DA cost report is a different product at $1,650–$6,500+, landing where the size of the project puts it. Missing records and room count move a home up the rows.
Within the inspected row, the Canberra fee moves with how much the surveyor has to estimate: receipts from the original build leave less to work out, a bare property leaves everything. Within $1,300–$4,500+, offices and shops are quoted one by one on their area, tenancy count and fit-out, which leaves the band open at the top. Ask before signing whether the fittings are in the same report as the building figure, whether a combined price covers the insurance figure too, and what the delivery date is.
Quantity Surveyor Cost in Canberra: What the Quote Should Include
In Canberra the quote should record which report is being bought, whether the surveyor visits, and the stage at which it is prepared, because an off-the-plan unit in Gungahlin is scheduled after handover rather than at exchange. Lines written down now save a second fee later.
- The row: $400–$550 for a unit with complete builder records, or $600–$1,000 where the vendor handed over nothing and the figure is worked out from the property itself.
- For an off-the-plan purchase, the timing of the report, prepared after handover, and whether the fee is fixed now or quoted again at handover.
- One report covering the building figure and the fittings, with the fittings installed before settlement in a brand-new unit listed separately.
- A note on whether general landscaping is listed at all, since it may sit outside the schedule.
- A rebuild figure for insurance at $550–$1,300 priced on its own, with a combined price if one visit can gather both reports.
- For a DA cost report, the drawings, the address and the report's purpose that the $1,650–$6,500+ fee was priced from.
- For a bigger house, the room count the fee assumed, since a four-bedroom home carries more to measure and list than a compact unit.
- The delivery date in writing, the charge for updating after a renovation, and GST on its own line; ask your accountant how the fee is treated.
Frequently Asked Questions — Quantity Surveyor Cost in Canberra
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →