Updated November 2026· Independently researched·8 min read
A quantity surveyor's tax depreciation schedule costs $450–$750 for a full-inspection residential report in Adelaide in 2026, $300–$450 desktop, and $1,000–$3,500+ for commercial property; insurance valuations run $450–$1,000 and construction cost plans $1,300–$5,000+.
A quantity surveyor measures and costs buildings. For most property owners in Adelaide that means a tax depreciation schedule for an investment property, an insurance replacement-cost report, or a construction cost plan.
Quick answerA quantity surveyor's tax depreciation schedule costs $450–$750 for a full-inspection residential report in Adelaide in 2026, $300–$450 desktop, and $1,000–$3,500+ for commercial property; insurance valuations run $450–$1,000 and construction cost plans $1,300–$5,000+. Get free Adelaide quotes →
Detailed Pricing — Quantity Surveyor Cost in Adelaide 2026
+1.5%Quantity Surveyor fees in Adelaide are up around 1.5% over the past year, re-verified against 90+ sources in November 2026.Year on year
Tier
Typical fee
What it funds
Desktop / self-assessed depreciation schedule
$300–$450
No site visit. Suits newer builds with documented costs.
Full-inspection residential schedule
$450–$750
QS inspects and itemises Division 40 and 43 assets. Lasts 40 years, fee is deductible.
Commercial / mixed-use schedule
$1,000–$3,500+
Offices, retail, industrial. Priced on floor area and fit-out complexity.
Insurance replacement-cost report
$450–$1,000
Rebuild valuation for strata or owner insurance.
Cost plan / sinking fund / DA cost report
$1,300–$5,000+
Construction estimating for developers, strata committees and council submissions.
Progress claim / bank drawdown assessment
$450–$1,550
Per claim. The surveyor checks the builder's progress claim against the work done.
Hourly quantity surveying advice
$100–$300 per hour
Ad hoc advice, cost reviews or help with a dispute, billed by the hour.
You're in.
A local quantity surveyor will be in touch about your enquiry. No spam, no call centre.
Getting quotes for Quantity Surveyor work in Adelaide? Get a quote from a local quantity surveyor — free, no obligation.
How to Keep the Quantity Surveyor Cost Sane in Adelaide
1
Order before 30 June so the first claim lands in this financial year.
2
Ask whether a desktop schedule is enough for a newer build with documented costs.
3
Bundle an insurance valuation with the inspection if you need both; one site visit.
4
Claim the fee: The report cost is 100% deductible in the year you pay it.
5
Keep the schedule: It's a one-off that your accountant uses for 40 years.
Quantity Surveyor Cost in Adelaide for a Strata Insurance Valuation
A strata committee insuring its building needs a figure for what a rebuild would cost. A quantity surveyor supplies that as an insurance replacement-cost report, priced in Adelaide at $450–$1,000.
Ask what the report counts: demolition, professional fees and common property such as lifts and car parks are worth naming in the brief. Also ask how often the surveyor suggests refreshing the figure, and whether an update costs less than the first report.
Quantity Surveyor Cost in Adelaide by Report Type
Quick answerIn Adelaide the fee tracks the report ordered and the way it is prepared: $300–$450 when the surveyor works from your documents, $450–$750 when the property is measured in person, and $450–$1,000 for an insurance rebuild figure.
If a North Adelaide unit came with the builder's contract and invoices, the schedule can be built from those pages at $300–$450. If a Glenelg house has changed hands with no paperwork for its extensions, the surveyor has to inspect, measure and date each part, which is $450–$750. A body corporate asking for a sinking fund forecast is buying a third product at $1,300–$5,000+. The step between the two residential rows is paperwork: the less you can hand over, the more has to be worked out on site.
Inside a row, size and condition set the figure. A house with more rooms carries more fittings to count, so it lands further up the $450–$750 band than a compact unit, and an Adelaide shop or office is priced on its floor area and the quality of its fit-out within $1,000–$3,500+. Ask before signing whether one site visit can serve both the schedule and the insurance figure, whether the fittings list is included, and when the report will arrive.
Quantity Surveyor Cost in Adelaide: What the Quote Should Include
In Adelaide an itemised quote tells you whether you are paying for a surveyor to walk through the property or to work from the plans you send, and whether the schedule, the insurance figure and any strata work are priced as separate lines. Quotes for the same Unley house are only comparable once that is written down.
Which row the fee sits in: $300–$450 from your documents, or $450–$750 with the surveyor at the property.
For a home in Norwood, Burnside or Glenelg, a line stating whether the visit is included and whether travel is added for the suburb.
One line for the building's construction figure and one for the fittings list, so you can see the schedule carries both.
Renovations by earlier owners named as work the surveyor will estimate, with the records you are asked to hand over.
An insurance rebuild figure as its own item at $450–$1,000, and whether it shares the site visit with the schedule.
For a strata committee, a sinking fund forecast priced on its own, with the lot count the fee assumes.
The delivery date for the finished report, stated in writing.
What an update after a future renovation costs, and whether it needs a second visit.
GST shown separately, and a note to ask your accountant how the fee is treated.
Frequently Asked Questions — Quantity Surveyor Cost in Adelaide
How much is a quantity surveyor in Adelaide?
Going by our Adelaide table, expect $450–$750 for a full-inspection residential schedule, $1,300–$5,000+ for a cost plan, sinking fund or DA cost report and $450–$1,000 for an insurance replacement-cost report.
What does a full-inspection depreciation schedule cost for an Unley villa in Adelaide?
An Adelaide bluestone or sandstone villa in Unley or Norwood that has been extended out the back, had a bathroom added and a carport put in is priced from the $450–$750 bracket, since the surveyor has to measure and date each piece of work on site. A home with a single, well-documented extension lands lower in the bracket; one with decades of undocumented changes sits higher.
What does a cost consultant charge for construction estimating in Adelaide?
Construction cost estimating in Adelaide, whether a cost plan for a new build, a sinking fund forecast for a strata group or a cost report lodged with a development application, is priced from the $1,300–$5,000+ bracket. A single-dwelling renovation sits at the bottom; a Glenelg apartment project with basement parking at the top. The quote should state which drawings the estimate rests on and how many rounds of re-pricing after design changes are included.
Can my accountant prepare a depreciation schedule?
Not usually. Where actual construction costs aren't known, the ATO accepts an estimate from a quantity surveyor or other independent qualified person.
How is a commercial or mixed-use depreciation schedule priced in Adelaide?
An Adelaide shop on a Norwood high street, a Burnside medical suite or an industrial unit is quoted from the $1,000–$3,500+ bracket, with the fee following floor area and the amount of fit-out inside. A bare tenancy with painted walls and a kitchenette stays near the bottom; a fitted medical suite with plumbing to every room, air conditioning and joinery climbs. Ask whether fit-out inherited from the previous tenant is listed separately from works you paid for yourself.
What does a strata insurance valuation cost in Adelaide?
For an Adelaide strata or community corporation the $450–$1,000 bracket buys a rebuild figure for the whole building, so the sum insured on the corporation's policy rests on measurement. The surveyor allows for demolition, professional fees and rebuilding to current methods, and a heritage-fronted block in North Adelaide carries a larger allowance than a plain brick block of units. Ask whether the report and a sinking fund forecast can share one inspection, since the measuring overlaps.
Our Methodology
These are independent estimates from public cost guides, marketplaces and industry rate data, and no provider can influence them, so always get a few quotes. Last reviewed November 2026. Read our full methodology →
Compare Quantity Surveyor Cost in Adelaide with Related Guides