Retaining Wall Cost Australia 2026
Retaining wall costs depend on the material, wall height, length, and whether engineering certification is required.
Choose Your City
National Pricing Overview
| Service | Low | Typical | High |
|---|---|---|---|
| Timber sleeper wall (per lineal metre) | $200/lm | $320 | $450 |
| Concrete sleeper wall (per lm) | $250/lm | $400 | $600 |
| Block / besser wall (per lm) | $300/lm | $500 | $750 |
| Sandstone wall (per lm) | $350/lm | $550 | $700 |
| Boulder wall (per lm) | $250/lm | $400 | $600 |
| Gabion wall (per lm) | $300/lm | $500 | $800 |
| Small garden wall (5 lm × 0.5m) | $1,000total | $1,800 | $2,800 |
| Standard wall (10 lm × 1m) | $2,500total | $4,500 | $7,000 |
| Large wall (15 lm × 1.5m) | $5,000total | $9,000 | $15,000 |
| Engineering / structural cert | $500per job | $1,000 | $2,000 |
| Drainage behind wall | $30/lm | $50 | $80 |
| Old wall demolition + removal | $50/lm | $100 | $180 |
National average prices. Select a city above for location-specific pricing.
A retaining wall in Australia costs $200–$450 per lineal metre for timber sleepers, $250–$600/lm for concrete sleepers, and $350–$700/lm for sandstone. A standard 10-metre wall at 1m height costs $2,500–$7,000. Larger or engineered walls can cost significantly more.
What Affects Retaining Wall Costs in Australia
Wall material
Timber sleepers ($200–$450/lm in Australia) are cheapest. Concrete sleepers ($250–$600/lm) are the most popular. Sandstone ($350–$700/lm) is premium but looks great.
Wall height
Walls under 1m are straightforward. Walls over 1m in Australia typically need stronger footings. Over 1.5m requires structural engineering certification.
Engineering requirements
Walls over 600mm (some Australia councils) or 1m (others) need a structural engineer's design ($500–$2,000). This adds cost but is legally required and protects you.
Drainage
Every retaining wall needs drainage behind it ($30–$80/lm in Australia). Without proper drainage, water pressure builds up and the wall can fail within a few years.
Site access
Easy access for a small excavator in your Australia property keeps costs low. If materials need to be carried by hand (steep slopes, narrow access), costs increase significantly.
Existing wall removal
Demolishing and removing an old failed wall in Australia costs $50–$180/lm on top of the new wall cost.