How much does a rendering cost in Hobart?
Most house rendering in Hobart costs $7,200–$11,700
for a standard single-storey home
A single storey house in Hobart costs $4,950–$11,700 to render. Two storey homes run $10,800–$24,300 (including scaffolding). Per-sqm rates range from $27/sqm for cement render to $72/sqm for texture coat.
+2.6%
Rendering costs in Hobart have risen this quarter, driven by strong construction activity and trade shortages.
Q1 2026 vs Q4 2025
Average Rendering Cost in Hobart
$126
per hour for standard residential work
Call-Out Fee
$63–$158
Emergency Rate
$263–$735
Common Job
$158–$420
House rendering in Hobart costs $27–$54/sqm for cement render, $36–$63/sqm for acrylic render, and $40–$72/sqm for texture coat finishes. A whole single-storey house (approx 150 sqm of walls) costs $4,950–$11,700. Two-storey homes cost $10,800–$24,300 including scaffolding.
Detailed Pricing — Hobart 2026
| Service | Low | Typical | High |
|---|---|---|---|
| Cement render (per sqm) | $27/sqm | $40 | $54 |
| Acrylic render (per sqm) | $36/sqm | $50 | $63 |
| Texture coat render (per sqm) | $40/sqm | $54 | $72 |
| Polished / venetian plaster (per sqm) | $72/sqm | $110 | $160 |
| Feature wall (indoor, per sqm) | $45/sqm | $68 | $99 |
| Whole house exterior (approx 200 sqm) | $7,200total | $10,800 | $16,200 |
| Single storey house (approx 150 sqm) | $4,950total | $7,650 | $11,700 |
| Two storey house (approx 300 sqm) | $10,800total | $16,200 | $24,300 |
| Old render removal (per sqm) | $14/sqm | $22 | $36 |
| Crack repair / patching (per sqm) | $36/sqm | $58 | $90 |
| Scaffolding (two storey) | $1,350total | $2,250 | $3,600 |
| Painting over new render (per sqm) | $11/sqm | $18 | $27 |
Prices verified February 2026 · Cross-referenced against 90+ Australian trade pricing sources · See methodology
Prices include GST. Based on Hobart metro area, Feb 2026. Outer suburbs may vary.